My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/28/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
2/28/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:06:02 PM
Creation date
8/20/2018 1:05:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S <br /> sprinklered , though it did not show on those drawings , <br /> Boilers - Mr , Pu r r i e r said every boiler has to have a high/low water and <br /> high/low heat with a shut off valve . <br /> Paul said there should be an isolation valve. They did not show on the 80 <br /> drawings but he asked sA to include it. <br /> Mr . Pu r r i e r said low water has to be there also for the insurance company ., <br /> H asked, if there is no irrigation system in the ba l l f i e l ds , how will their <br /> get water , i s there any chance of puttiong in a well ? If he has to hook up <br /> to a hydrant it will cost money ,. <br /> Paul said they appreciate that, the committee will be going over the list <br /> of alternates and the well and irrigation ars on the list. They will <br /> breakout the cost of the well . <br /> Paul asked Phil to send two sets of the new drawings , one for the Committee <br /> and one to be available in town hall . <br /> Bill asked Mr. Puri`i er if 400 sq feet was sufficient amount of space for <br /> the storage/garages? what height he would prefer" <br /> Mr. Pu r r i e r said he would think about. <br /> The building will have electricity and some heat <br /> Mr. Purri er said he would only like to see 2 doors with locks, the front <br /> door and loading dock . The rest should be 1 way -out only P <br /> Phil said the building is designed for multiple approaches . <br /> Dr . DeMou r~a said the fewer outside door handles and locks the better . <br /> Paul agrees. He had asked for magnetic holders on these doors , they <br /> shouldn ' t need any other hardware. He sent a letter a. long time ago <br /> regarding this issue to SNDA . <br /> Phil reviewed the building and the deers people w111 need access from <br /> at north side of building , student drop off - needs pulls . <br /> -- west side , handicap access for students , needs pulls . <br /> - west side of library the "junior high access, needs pulls . <br /> -- Main entrance . <br /> - Access to the gym, on the west side between the gym and teachers ' dining <br /> needs pulls . <br /> Service area needs pulls. <br /> All other door will just have egress hardware <br /> Paul said there should be magnetic locks so the doors can ' t be opened <br /> unless there is an emergency. <br /> Bill Hauck suggested the Fire Department have a review of that, they may <br /> need to gain access. <br /> Paul said there is a security system, with card entry system. Keys should <br /> be limited to f or 2 doors . <br /> He suggested SMMA review this and talk with him Before the end of the week . <br /> Bill Hauck said they should review the codes there should be panic <br /> hardware , <br /> Mr. Purr i er asked that the loam for the bal l f i e l ds be specified loam and <br /> not wood loam, You cannot grow grass with wood loan,, <br /> Phil goes not think that will be an issue since the landscape architect <br /> will be specifying the loam but he will check i t, <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.