My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/18/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
4/18/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:01:18 PM
Creation date
8/20/2018 1:09:19 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/18/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
school well will be . <br /> Tom Wren put together a list of all of the cuts made to date . (copies to <br /> he sent to committee members) , <br /> Paul said if the committee spends any money now, he wants to see a value , <br /> for example dual fuel , which now makes sense because we can afford it. <br /> Merry sue would like to see more landscaping materials added . <br /> �- the committee received a memo from SMMA re : theater lighting . Inc 1 uded <br /> in the current bidding documents (GC) are conduit and wiring , fixtures <br /> diming and lighting controls . <br /> For the CCTV, included in the bid documents were conduit, cabling , coaxial <br /> cable and cameras. <br /> - memo from Bill Haug who is happy with the final drawings . <br /> - letter from torn counsel who obtained a partial release of the easement <br /> on the site , <br /> - letter from Joel Seeley regarding traffic study design work . <br /> Paul said there are still some issues on the 2 other intersections <br /> discussed in the traffic study . <br /> Greg Taylor said he explained to the Commission that it was a <br /> misunderstanding , there are no physical improvements to be done at those <br /> intersections . <br /> Paul explained that the commission has asked that the Committee go ahead <br /> and design the 1 5 1 intersection but it is not the Committee ' s <br /> responsibility for implementation of the traffic signal . The EI R says the <br /> Torn will take the necessary means to get it designed and the action to get <br /> it resolved. once it i s designed , Greg can go forth and ask for funding . <br /> Greg said the transportation improvement list, which i s state and Federal <br /> funds, has the signal on the list for next year . <br /> Paul said it is his recommendation that the Committee approve the phase II <br /> design work , for $21 , 500 , so that Greg can get the intersection funded . <br /> Steve said it is a good value . <br /> Steve made a motion to authorize SIGMA (VHB) to proceed with Phase <br /> II design work in the amount of $21 , 500 , Merry sue seconded <br /> the motion . All members were in favor. <br /> Phase I design work includes the curb cut, old Barnstable Road work - <br /> widening to 4 lanes , bike path . <br /> The committee felt this work was within SMMA 's scope of work , SMMA <br /> submitted a rebuttal to town counsel ' s opinion on this matter and Town <br /> Counsel still feels it is within SM A 's scope. <br /> Ed sail d off site work is beyond the scope of their contract. <br /> Paul said this work must begin and he would recommend the committee approve <br /> the work even though this issue has not been finalized . <br /> Paul made a motion to approve phase I (design work by VHB for <br /> $15 , 2000 . Merry Sue seconded the motion . All members were in favor <br /> 6-o <br /> CLERK OF THE WORK INTERVIEWS <br /> J i rn Byrne was the first candidate to be interviewed . r . Byrne explained <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.