My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/18/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
4/18/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:01:18 PM
Creation date
8/20/2018 1:09:19 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
04/18/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
paperwork and pictures . <br /> Joe asked if he had done a block building before ? <br /> Mr. Byrne said he had , block and brick veneer, <br /> Paul asked about as built d rawi nqs , 1'5 he in favor of contractors keeping <br /> up with their submission? <br /> m r. Byrne said he is holding money now in Yarmouth for that reason . <br /> Hea 1 d a clerk i s not the person to be pushing the job. He w i l 1 not g i ire <br /> direction to the general contractor . A successful job is a team. He has <br /> no problem giving advice but not direction . Any questions would go to the <br /> contractor , or technical questions to the a rch i tett O <br /> Paul asked him about job meetings? <br /> d on his currentjob they have weekly job meetings . In th1s <br /> her+ Byrne say <br /> Chartwell will have manpower on the job as well as the architect . <br /> Paul said Chartwell 1 l will have manpower as part of the project project,• � e st but not as <br /> '� <br /> part of the clerk job t <br /> Ed said it would be helpful fu l for everyone if the clerk knows how the pro*ect <br /> i srocee d i n and anticipates any arising problems . H e asked r . Byrne h i s <br /> p � <br /> strategyto et out in front of problems . Eany times it is only a problem <br /> once it is built, but won ' t be a problem if it is anticipated . <br /> � - <br /> Mr . Byrne said as he really gets into the plans you start to spot things . <br /> As he reviews the shop drawings and submittals , he thinks ahead . He has to <br /> be very organized to function . <br /> Mr . Byrne <br /> said the Committee is welcome to come by the school he is working <br /> on , it is a good chance to review their network and see some things they <br /> wish they had done differently . <br /> Ed asked him m where he saw his responsibility for policing people working <br /> with unapproved documenis , which is a big problem, about So of subs work <br /> with unapproved documents . <br /> Mr. Byrne said in hisp inion they do the work at their own risk . He would <br /> notify the architect. <br /> Mr . Byrne asked the committee ' s timetable for making a decision? Paul said <br /> they will decide by next Monday4l <br /> of omeo. He explained he i s currently working on the Cambridge <br /> B� l 1 DiBartolomeo. , , , <br /> elementary school , a l0 million project. Contaminated soil was found <br /> which delay project.ed the ect. Prior to `that he worked on the Jose l i n Diabetes <br /> "� <br /> building , a 7 million addition , adding 3 floors to the existing building . <br /> He worked on <br /> a WellesleyCollege addition including labs , auditorium, <br /> classrooms a o million project. The Harvard Business school athletic <br /> facility, a new o million building . <br /> Paul asked him his background , before he was a clerk? <br /> He said hew <br /> as a resident engineer at a power plant . His mechanical <br /> experience is solids <br /> Paul asked about the Cambridge School ? <br /> Bill said it is an elementary school , 4 stories , designed by HMFH . <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.