Laserfiche WebLink
Paul asked SMMA to review the present air conditioning system. <br /> Additional seats at the football stad i um? <br /> Presently there are Soo . Merry sue would prefer to see lights VS . <br /> additional seating . The money should go other places first. Peter <br /> suggested it as a low priority item. <br /> Paul asked sMMA to come back with some recommendations. <br /> Peter explained that Greg -Tay 1 or and the County are working on <br /> signal i zati on for the i ntersecti on it is a high priority on a county 1 i st <br /> and it may be done before the project i s complete . <br /> Joe asked if there is any news regarding the sewage treatment plant? <br /> Joel said they met with DEP and Woodard and Curran this morning . DEP' s <br /> comments were minor and addressed with documentation . They completed the <br /> application , which was signed by Bob wh r i tenon r and that activates the <br /> process . There is another meeting Wed , at 10 : 00 ate P office to <br /> discuss the SBR process and hear DEP ' s comments and address them,, The <br /> O rocess is moving along fine. <br /> Steve asked where it stood as to which system we will use? <br /> Joel said after tonight ' s Selectmen ' s meeting , when the contractor is on <br /> board they can ask the contractor when he carried ( in his bids . They can <br /> short a step at DEP, they won ' t have to carry 2 systems in the permit . <br /> Steve asked that Elias McQuaid be kept in the loop . <br /> Paul said the 2 systems in the specs , were very comparable, for maintenance <br /> costs . It was clear that cromaglass was not going to be accepted by DEIN. <br /> c romag 1 ass has burned more bridges than they fixed . <br /> DEP seems to understand and accept these systems, <br /> Steve said his personal preference would be SBR , Chemical addition will be <br /> less with that system. Each system can work equally well but the issue to <br /> him is the amount of chemical treatment, the less you have to add the less <br /> can go wrong <br /> Paul asked about testing contractors? <br /> Joel said they contacted some testing labs that sMMIA has used in the past,, <br /> They sent letters to 4 firms asking them to provide pricing for certain <br /> types of testing , on a per test or per day basis : soils , steel , welds, <br /> masonry . <br /> Paul asked about surveying work? <br /> Joel said ILSs was going to work on the early site package but because that <br /> was voided it has become part of the general contract. <br /> Paul asked if there will be a protection fence around the site? <br /> Joel said around the building area, not the entire site . <br /> Bi 1 1 asked about the size of the storage building? <br /> It will be 400 sq feet. It was not made larger because the school <br /> department will probably bid the maintenance . <br /> Paul said the dirt road on the site is heavily used . stone may want to <br /> 6 <br />