Laserfiche WebLink
They Have had the iron workers on site to review and discuss any <br /> potential problems . <br /> Pa.ul.. asked. it they have seen any shop drawings for exterior <br /> finishes? <br /> Joel said not the block but all the accessories . <br /> Mr . Barthel€r€es said they will be doing a 4 x 4 mock up of the <br /> wall , they just need to determine a location . All the paperwork <br /> is in and back . The samples must be approved . <br /> Paul said if this can be worked out before the 12Lh , the <br /> Committee can start the meeting there to review them. The <br /> Committee tt;ee will be better off seeing the wall , SMMA can review the <br /> samples . <br /> Peter mentioned his concern of efflorescence . He ea;plained the <br /> problem the middle school addition had with moisture . Stone <br /> needs a good plan to dry the building out , <br /> Mr . Baarthelmes said the efflorescence is the salt in the bricks <br /> coming out of the brick from the moisture inside , The biggest <br /> water producer is the slab and they are dowry now. They will be <br /> heating the building all through construction . He thanked them. <br /> for the warning about moisture . <br /> Draft Change Order: Torn said there is not much more to report . <br /> Stone is requesting 4 more weeks on top of the 3 weeps they have <br /> already had . <br /> Paul would like to hear from SMMA at the next; meeting regarding <br /> Stone ' s change order. submission . <br /> Paul. explained that Stone does not believe they are responsible <br /> for: the overtime for clerk of the works . Paul asked Char_twell <br /> for a written response on why it should be Stone ' s responsibility <br /> and he asked Town Council to review the issue , <br /> If overtime is required , because they are behind , then clearly <br /> the overtime is their fault . Tf it is voluntary overtime that is <br /> a different, issue . He wants to warn the Committee there is a <br /> potential addition to Chartwell ' s contract for the clerh ' s <br /> overtime . <br /> Peter asked if the clerk has to be on site whenever someone is <br /> working overtime? <br /> Paul said Jim has used his judgement and been there only for key- <br /> elements , <br /> .eyelements , He has used good judgement to date. and Paul continues <br /> to talk about it with him . <br /> Peter asked Bi.l.l. Hauck if he has been to the site? <br /> Bill said so far he has seen good quality work. The clerk is the <br /> person who oversees the work, Bill_ is just checking codes . <br /> The engineer has the legal responsibility for inspections on the <br /> job. <br /> Bill said he looks for details . If they are taking care of <br /> details it gives you a clue about the quality of construction. <br /> If they are behind schedule you really have to watch out . <br /> Paul said that Jim has a. keen eye . Personally, he is very <br /> 4 <br />