My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/26/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
9/26/1995 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:11:39 PM
Creation date
8/20/2018 1:45:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/26/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
{ <br /> Mashpee High School Building Committee Meeting <br /> September 26, 1995 Page Three <br /> High School Site <br /> Contractor f Fourth lnteri M Payment.,Re ui.siti.on <br /> P. Griffin mored to forward to Mashpee Board of Selectmen for <br /> approval and payment of $805, 175.00 for request #4 of Stone Building <br /> Company. Peter B. seconded the motion, All were in favor. <br /> P. Griffin moved to forward to Mashpee Board of Selectmen for <br /> approval and payment of $16, 695,00 to Chartwell & co. for basic <br /> P� P � <br /> project management through September, inc1uding overtime for the <br /> months of August and June. Peter D. Seconded the motion. All were <br /> in favor. A discussion with 'own Counsel. will. held to discuss <br /> overtime,. <br /> P. Griffin moved under protest to forward to Mashpee Board of <br /> Selectmen for approval and payment of $15, 200 ,00 for phase 1 design <br /> work on road to entry of the site. Peter D. Seconded the motion. <br /> All were in favor. <br /> Draft Chan orders <br /> Change order #2: To change the auditorium seats from wood to <br /> upholstery at the cost of $41,000. <br /> For changes required b D.E.P. in design of the WWTP at the cost of <br /> g <br /> $1018006 <br /> For changes in the Kitchen Equipment at the cost of $15,000.0 <br /> P t Griffin moved to forward to Mashpee Board of Selectmen for <br /> approval of $67, 400 for Change order , as listed above. Peter D. <br /> �P <br /> Seconded the motion. All were in favor. <br /> Change order #3 : For changes in Piping from a 611 line to a 1011 1ine <br /> in the cafeteria under the slab and rolloff drains. This will be <br /> reviewed at a later time, <br /> P. Griffin moved to forward to Mashpee Board of Selectmen for <br /> approval $14,372 to Stone Building Co. for adjustment in areas of <br /> sketch S P 6, 7, and 8 on response #RFI 85 . Peter D. seconded the <br /> motion. All were in favor. <br /> Chartwell will pursue a cost on a roofing .inspector and UTS will he <br /> on site tomorrow to inspect* <br /> P. Griffin moved to adjourn the meeting at 6 : 30 P.m* Peter B. <br /> Seconded the motion. All were in favor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.