My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/24/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
9/24/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:12:04 PM
Creation date
8/20/2018 2:00:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/24/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br /> r• <br /> r <br /> f <br /> that he has not seen, it could create a. problem for the system. <br /> ,Joel has talked to Mike Kirwin about this . There are ar few issues with the <br /> Tv outlets beyond that one . He has talked with HB who is installing them. <br /> They will issue a directive to stone to fix those areas . There will then be <br /> a spot check. <br /> Mike thinks every single one should be checked. <br /> Steve said there is a way to test the connections , with a TDF , it will toll <br /> you the quality of the connection. <br /> Paul sarld they should do a, spot check and TDR, if they are not satisfied, <br /> they will inspect all of them. we will not accept anything substandard <br /> Paul asked Manny for an update on the furniture and equipment , in general . <br /> Manny said most of the furniture needed for opening ',s on site . 800 more <br /> chairs are coming , Miscellaneous items are coming in a few day. The <br /> cafeteria tables are all here . Stacking chairs are all here . <br /> The library shelving is 60-70% complete , library furniture is all on site . <br /> .John Williams asked about installations . It was said there would be an <br /> absence of workmen during school hours after taking occupancy, how will <br /> that be effected? <br /> Paul explained there will be no construction work. Furniture installation <br /> wild. go on. <br /> Jim has notified vendors that some delivery and set up may have to be <br /> scheduled around the school day. <br /> .dim explained that he has finalirzed with Manny what sections are to be <br /> unloaded and installed vs . those that are not . Dr. DeMoura has provided a. <br /> custodyan to assist Chartwell in unloading <br /> Paul suggested to the Committee that they authorize Chartwell to obtain <br /> manpower when necessary, at a. cost to the Committee , to deal with delivers <br /> that do not 'Include unloading or installation. The Committee would have <br /> bought it from the vendor if it were available . we owe it to the school <br /> Department to set up the building on our budget not theirs . <br /> Committee members agreed. <br /> Dr. DeMoura will keep the bills of the custodians working in that capacity <br /> separate . <br /> Grey board in the classrooms : Pa.0 l explained Fd Frene t to has said the glare <br /> is no different on the boards whether they are mat or gloss ( they tested <br /> them) . Only a screen will eliminate the glare , <br /> Merry sue said she has seen the grey boards in action, without the glare . <br /> They specifically asked for mat finish and these are glossy. The mat grey <br /> boards are advertized for projection ion ca.pab.ility. <br /> Maul said what i s installed is ghat we bought . <br /> Merry Sue said it is not ghat we asked for <br /> Paul suggested the school department go through the roams and make a. list <br /> of their concerns + <br /> John Williams would like a bulletin board in his office . <br /> Dr. DeMoura sent the committee a, letter asking for intercom system <br /> training . <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.