Laserfiche WebLink
Paul said we are owed an enormous amount of training + They will begin to <br /> schedule it . He strongly suggests it is video taped. <br /> .Janice suggested that very soon we ask Mike Pletrowski to video tape the <br /> High school with a. running commentary and put it on the educational <br /> channel . <br /> Paul added that once the classrooms are set up, have some still photos <br /> taken, including the exterior and set up a board at town meeting . <br /> Mike Pietrowski will get the photos done . <br /> Mike said the high school, channel will be 75 . <br /> Miscellaneous Matters <br /> - acid neutral i zat ion tank, weeks ago the plumber said. it would be done <br /> in two weeks . Joel said they have received shop drawings and sent them <br /> back <br /> - Spare lamps . ,Joel sent a letter to stone and after reviewing their <br /> response found the value to be unacceptable . He gave them guidelines but <br /> they have not responded back, <br /> Paul suggested in may be in the schools best interest to take the credit in <br /> product since the money goes back to the town. <br /> Steve said they should negotiate on how much overage of product to cover <br /> the labor costs <br /> - superintendents office : Paul spoke with stone today. They will make calls <br /> tomorrow to get it going . <br /> Duel Fuel meeting : Steve met with the Cape Cod Commission to relocate the <br /> tank in the area behind the mechanical room. They were very favorable to <br /> that . It doesn' t look like the town will ever develop the P1 well , we will <br /> have to file a, modification when we are ready. Steve suggested design <br /> build and seek the architects assistance in putting together the <br /> spec i fiat iors . <br /> ,Joel wi 11 prepare a proposal for A' s assistance <br /> Merry sue asked how much this will cost? <br /> Paul said we won' t know until we put it out to bid . <br /> Steve wants to beep it a simple design. All above ground , conventional <br /> tankage which has to be covered with a bunker underneath. Where needs to be <br /> a system to detect leakage <br /> (Jim left the meeting at 6 -* 00 p .m. He thanked the Committee for the <br /> flowers that they sent * ) <br /> CHANGE ORDER <br /> ,Joel presented change order #23 for $4 , 310 for: <br /> -� relocation of drywall pet It lon in stair #1 & 4 <br /> provide coupling valve for irrigation system as recommended by Ilan <br /> olien. <br /> Paul made a motion to forward to the Selectmen for their approval <br /> change order #23 for $4 , 310 . berry Sue seconded the motion. <br /> All members were in favor 5-0* <br /> 8 <br />