My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
11/12/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:11:36 PM
Creation date
8/20/2018 2:01:47 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/12/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
down? <br /> Joel said it is . <br /> Of the 36 items on the original fire department list , 11 are left <br /> to do. Joel sent that list to Stone today. <br /> George Baker felt those 2 items , rolling door and sidewalk need <br /> to be done before the school opens . <br /> Letter from Leo Jolly. The water is not flowing downhill in the <br /> kitchen, shower areas . Paul does not know if this will be an <br /> issue for opening . <br /> Joel said Bill Hauck says it will . A copy of this letter was <br /> sent to Stone. The drains are on the punchlist . <br /> Joel said that Stone has asked for a meeting to discuss the non- <br /> complying plantings . Joel wants direction from the Committee . <br /> Paul said we want what was speced ! <br /> - TV height issue : Joel said, because they are not in the path of <br /> travel , it is not an issue . He will meet with HB on Friday and <br /> go over the location so they can begin to install them. <br /> - Letters from Bob Sherman re : wetland damage to the kettle hole . <br /> Stone said they were advised by their lawyer to wait until they <br /> get Cons Com direction on repairs before beginning any repair <br /> work. <br /> - Slice seeding is done except for the infields . Dan Solein had <br /> mentioned at the last meeting that area (. infield) may have to be <br /> completely re-done . <br /> - Paul said after reviewing it today, he is not sure he is happy <br /> with the modification to the bathroom near the gym, he is not <br /> sure it is accomplishing anything . <br /> Dr. DeMoura suggested it would be simpler to just remove the <br /> mirror. <br /> Paul suggested adding a petition so that is what is reflected in <br /> the mirror. He asked Joel to look at it again. <br /> CHANGE ORDER #27 <br /> Joel presented change order #27 for: <br /> - electrical power to the auditorium projection screen. This was <br /> a CCD to Stone , $2 , 700 . <br /> - motorize the gym bleachers <br /> - concrete masonry at locker bases in locker room, to raise it . <br /> - knock box at STP, fire department requirement <br /> - wire mold at case work, conflicted with the casework and had to <br /> be shifted 4 feet . <br /> Paul made a motion to forward to the Selectmen for their <br /> approval and payment change order #27 for $32 , 578 . 00 for <br /> the above 5 items . Merry Sue seconded the motion. All <br /> members were in favor 5-0** <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.