8/12/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
>
8/12/1996 SCHOOL - HIGH SCHOOL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2018 5:09:20 PM
Creation date
8/20/2018 2:31:18 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/12/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Merry Sue asked about the railing at the corridor, the sheetroc <br /> is all broken' <br /> Jim said they are doing repair work to the railing , the fill on <br /> the bottom is not yet completed <br /> CONSTRUCTION PROGRESS <br /> Stone said they will have all of section A, B & E ready to <br /> inspect by the end of this week. SMMA has to do an above ceiling <br /> punchlist in c & D this week. <br /> SMIA did a punchlist for derrick 1 and Stone has completed almost <br /> all the work, only minor items and paperwork are still due . <br /> There was a meeting with Stone , their attorney, the bonding <br /> company and. Paul on Friday morning . They discussed the definition <br /> of substantial completion. The contract clearly defines what it <br /> Is ., Presently, the best date for substantial completion for A,B <br /> & E is August 23rd. <br /> Merry Sue asked if we can use the building without an occupancy <br /> pe rml t'. <br /> Paul said the building inspector was at Friday' s meeting . He <br /> does not think there is a problem with that until September 4th, <br /> when the students arrive . <br /> The Committee reviewed the plans which are maned with red lines , <br /> f o r where a snow fence wil1 be installed to keep students out of <br /> construction areas . Purple areas are site work that must be <br /> finished before school opens , except possibly for the shrubbery. <br /> The large trees and seeding will be completed. <br /> Section c & D are close but Paul does not thinly they will be <br /> ready for Sept . 4th. cafeteria equipment is going in now, should <br /> be finished by 16th. Gym ceiling goes in on the 14 , 1th. They <br /> are presently sanding the floor . <br /> There is still a lot of work in the shower areas . Epoxy floors <br /> were supposed to start today. <br /> Stone was told we want the auditorium ready by October 6th ( for <br /> Oct 7th town meeting ) but they weren' t sure they could make it <br /> They painted the above ceiling the wrong color. <br /> Mike Pietrowski asked if there is any scaffolding or walkway to <br /> reach the 1 ight ing , '.n the auditorium? <br /> q. <br /> Paul said there is a special rig you can rent to go between the <br /> chairs to reach it . <br /> Mike asked if the lights at the stage are changeable? <br /> Paul said the light work is not yet completed, it will be taken <br /> care of. There is a tremendous amount of work left in there . <br /> Art areas : there is drop ceiling work and clean up remaining . <br /> Stege asked about the status of the bathroom wall? <br /> 4 <br />