r <br /> Peter asked how the f ire detection, alarm and security systems are working? <br /> Paul said they are very sophisticated systems . The security system is <br /> operational in A,B & E but zoned out for C & D. <br /> Paul said there are a, few things remaining to be done in. C D. Expansion <br /> joint plates by the locker room corridor will not arrive for 2 1/2 weeks . <br /> He described a possible alternative solution until they do arrive . Joel <br /> does not think you need the plates for building occupancy. <br /> Joel explained he has begun to punch out D. <br /> The acid neutralization tank is scheduled to be delivered, Tuesday* By the <br /> end of the week they can start using the science labs . <br /> Athletic Fields : stone has hired a. company from the lower Cape to do the <br /> slice seeding; they have more sophisticated equipment . They were to start <br /> Thursday but because of the rain they plan to wait until next Thursday. <br /> Steve asked if they dial the remediation work? <br /> Jim said they have done a lot of it. They have been working on the f1elds <br /> every day since the last meeting , Dan Bollen has been here every day. <br /> Waiting until next Thurs . for the slice seeding was a joint decision of the <br /> contractor and Dan. <br /> Tern Wren asked, now that we are out of the growing season, is Stone seeding <br /> at their own risk? <br /> Noel said they have been notified that there will probably need to be a <br /> third seeding in the Spring , <br /> Merry Sue asked if this will delay the track until Spring? <br /> Paul said he and Joel have talked about the benef,lts of delaying the track: <br /> - the track installer needs perfect weather to put it down, at this point <br /> it is a real wild. card. <br /> �- <br /> if the fields don ' t take , they will have to run trucks over the track in <br /> the spring to fix the fields . <br /> They will need to get a storage recommendation from the manufacturer <br /> because the materials are already on site . <br /> Peter asked if the baseball fields will be ready by Spring? <br /> Paul said we don't know yet . The students should not play on them <br /> prematurely. <br /> John Williams said they hadn' t planned on using the baseball/ softball <br /> fields this spring <br /> Tom Wren asked about the football scoreboard's Joel asked John Williams <br /> about it at the last meeting . It is a turnkey package . <br /> Road Improvements : The poles have finally come out of Ol.d. Barnstable Road.. <br /> Today they are working on the top courser The road markings and sidewalk <br /> remain. <br /> Toms explained there is still some paperwork to be completed, because of <br /> back charging for the moving of the fire hydrant (which wa.s originally <br /> installed in the wrong location) . <br /> 2 <br />