Laserfiche WebLink
4 <br /> Board of Selectmen <br /> minutes <br /> September 10, 2012 <br /> APPOINTMENTS& HEARINGS: <br /> DPW Director: <br /> Great Neck Koad.North,Pro*ect 11pdate and Construction Schedule: <br /> The DPW Director announced the Great Neck Road Northproject is ready t <br /> move forward. Phase I construction scheduled to begin this fall Will include tree <br /> removal,preparation for the sidewalk and the completion of the drainage work <br /> along the entire length of the road. <br /> The final scope of the project including the extensive drainage work incorporates <br /> a ' sidewalk along the entire length of the road,thee-aliment o 3 <br /> intersections and the installati <br />