My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/10/2012 BOARD OF SELECTMEN Minutes
>
9/10/2012 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2018 5:27:14 PM
Creation date
8/31/2018 1:58:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
09/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 <br /> Board of Selene <br /> Minutes <br /> September 1 o,2 1 <br /> do <br /> APEQEDffiNTS &UAMGS <br /> lna a(ommittee—October 15,2012 Town Me!gM Warrant Review: <br /> All members of the Fir= a Cottee were present with the exception o <br /> Charles Gaslor. Finance Conunittee members In attendance included George <br /> Schmidt,Mark 1avuu,Chris Arris,Oso Klemm and"ferry Cook. <br /> Sheriff C Chef Baker—CMED Seri sfele: <br /> George Baker, Fire Chief was in attendance with Shoff Comings <br /> to review in de a ,the proposed CMED Sees Article. It was noted the article <br /> was placed on hold at the lost Selectmen's Meeting for addition review and to <br /> obtain an amended Fire Dispatch Center contract to include CMED Services. <br /> Sheriff C 12""s'described the CMED program offered by.the Bamstable <br /> County Sheriffs,ice. <br /> An amended coutraet was before the Board for the Operation of a 1i m Dispatch <br /> Center for the Town of Mashpee by the Barnstable County Sheriff s Office. The <br /> agreement as amended shall ever the period from July 1,2012 through June 30, <br /> 2013. Each year the parties sal agree to a new 1'eer foi Fire Dispatch,a <br /> new Dual dee for CMEO Services,and to update the Fire Dispatch and CME <br /> fee structure. <br /> Included for the period,.duly 1,2012 through June 30,201.E is,the followmg <br /> CMED Cost'Fee Structure reflected the contract as Addendum 2: Total cost per <br /> Patch$5.36 based on an estimated 1,364 patches or connections'with the hospital, <br /> The total cost for CSO SeMc s is$7,311.04. As per the agreement of the <br /> pares,the first year would be charged at half the total cost: $3,655.52. Next <br /> year,the cost would appear.as a dull billing on the addendum. Funding for the <br /> planned epees would derive ftom the Ambulance Receipts Account. <br /> Motion made by Selectman Cahalane to remove the hold, and accept the new <br /> contract addenduin relative to the CSD Cost Fee Structure as outlitned. <br /> Motion seconded by Selectman Taylor. <br /> VO'C'E: Unanimous. 54. <br /> Roll Call Vote: <br /> Se1eetman Richardson,yes Selectman Sherman,,yes <br /> Selectman Taylor,yes Selman Cahalane,yes <br /> Selectman O'Hara.,yes Opposed,none <br />
The URL can be used to link to this page
Your browser does not support the video tag.