My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/13/2013 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
2/13/2013 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 5:01:44 PM
Creation date
9/4/2018 1:56:09 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/13/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
New Business <br /> Review ofF 1 4 CIP <br /> Catherine distributed a copy of the Planning&Construction FYI 4 Capital Budget she prepared. <br /> Catherine explained the details of the top priority items listed,but said she is not hopeful these will be <br /> approved. <br /> 0 Catherine explained the items listed for the school cover replacmng 20-year old-carpeting in High <br /> School classrooms. <br /> 0 Bathroom improvements at Quashnet and KC Coombs needed since most are original to when the <br /> schools were built during the o's and o's. <br /> 0 School locker repair/replacement item was requested by the School Committee. <br /> • Catherine said the storage garage/parking lot at DPW has been on the list for years. <br /> Parking lot at Quashnet School is falling apart. Catherine advised that recently sewer drain <br /> collapsed;they have issues with circultion. <br /> ,Toe Krait commented that when work done on bathrooms instead of walls use blocks and just a door. He <br /> said a lot of malls are using this method noir so here may be a cost savings. <br /> Catherine stated Joyce Lion asked that an application for funding be submitted for the school RVAC <br /> projects to.11rIA School Building Association. Catherine said it could be up to 30%reimbursement but to <br /> follow the steps required it could take another year to get the approval for funding. Deadline for <br /> submitting statement of interest is April 15, 2013. Catherine will be submitting application for HVAC <br /> projects for both Quashnet and KC Coombs schools. Catherine said once application is filed if it is <br /> accepted next step would be to do a study. <br /> Communitv Park <br /> Catherine reported the Park Committee is working with ars architect for design on the park trying to tie in <br /> the archives/park/school house. They are looking at doing a pre-fab structure you can get from landscape <br /> design company. Catherine will forward design to PPC as soon as she has it. <br /> "ttauin Par <br /> they are looking to replace the front playground and do a shade structure. They will go to May Town <br /> Meeting for funding. Catherine said they are still working on design with playground manufacturer. <br /> Next Meetig .,jo be scheduled after Catherine receives information to be reviewed by PCC. <br /> Ad <br /> iurnmen <br /> Irving Goldberg motioned the meeting be adjourned;Joe Brait seconded the notion; and it was <br /> unanimously passed. The meeting adjourned at :05 p.m. <br /> Respectfully submitted, <br /> kn <br /> b rti <br /> g Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.