Laserfiche WebLink
JAN-16-'96 TLE 13:30 I L *MRSHPEE PUBLIC LIB• TEL NO+ -50 3-539-143 f 4396 PO <br /> r <br /> 130A <br /> RD OF LIBRARY TRUSTEES MONTHLY MEETING <br /> TUESDAY, JULY 11, 1995 <br /> 7 :00 <br /> PRESENT. ANTON BUSCHENFELDT <br /> E E E DEFOE <br /> MIMI . MARSH <br /> TONT ROBERTSON <br /> GLORIA 'SELANDER <br /> RICHARD SHAUG NESS <br /> 11 MINUTES: Minutes frOM preViOUs meeting:' The minutes t f . 'u e <br /> 1995- we 'acep - - as presented. <br /> T 1 I REPORTS: i b ari.ars: Helene DeFoe reported -that for the month <br /> of jure, there had been -transactions, 250 .more <br /> than the previous June. For the year, the prelirnin- <br /> ary figures show 77, 751 total ci 'culati on, 5, 600 more <br /> than- last year, 8% .More than the previous i s a l yeare <br /> People count for the year was 52, 462 which was 41.10 <br /> people over the previous year, and j :increase in <br /> the number of .people using the library.- <br /> Friends <br /> ibra y.- <br /> ' iends of ,the Library!. Terri liycle was not present <br /> at this meeting. Helene had received a report: The <br /> boob s ale was $53. 00 . <br /> lV CORRESPONDENCE: None. <br /> V BUSINESS PROM PRECIOUS ME'T1N <br /> A Long Range Plan - future expansions; Mt. Deane to address the <br /> Board regarding future expansions - Dick -Shaughnessy ,introduced . <br /> Charles Deane of Gaf f ney -, ,i tuts, and Robe rt H Therr.ien <br /> Re i t Architect, ►ew e ' : ra y Associates o. the -m t- <br /> g. .5a <br /> ad .-been xnvit d <br /> i The 'e res ntatives f .ne - otiate h <br /> g <br /> to <br /> i us s ft ti r � ans i n f the ,Mai ,rape .Iii. ary, s ,-part the <br /> longi range Plan& 4 <br /> The Tien explained that the original design of the library . <br /> . <br /> building had a very straight forward future a pans ion concept, <br /> extending the two rooms, which would be the most economical way <br /> t go. oweve `, in terms �o lana use, <br /> i t does not work toowell. <br /> Mr. Thi an reviewed the existing -plan and discussed how expan- <br /> sion could be carried out. <br /> Various ossibiliti s in terms of .expansion were discussed, in- <br /> cluding a two-story scenario with the possible addition of <br /> ft-Ame for future elerator access f with a partial .basement ad- <br /> dition <br />