My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/16/2018 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
8/16/2018 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:41:56 PM
Creation date
9/21/2018 12:41:46 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a cost to re-wire the zone. The Town Manager agreed. The repair will be paid from the <br /> contingency. <br /> Recommendation for Proposed Change Order <br /> Change Order No. 4 was discussed. There is a net addition of$10,606.17 to the project cost. <br /> The change order includes: <br /> PR008/PC08 The original scope included abatement and removal of VCT flooring for <br /> installation of handicap accessible lockers in compliance with ADA/AAB requirements. The <br /> scope of this proposal request/change order allowed re-use of the existing locker bases, <br /> eliminating the need for abatement and removal of the flooring. <br /> PR012/PCO12 The original scope included glazing of the glass in the cafeteria door. The scope <br /> of this proposal request/change order replaces the glazing with a room darkening tint. <br /> PR014/PCO14 Change Order No. 2 previously approved by the Board of Selectmen on May 21, <br /> 2018 authorized the replacement of all countertops in the student bathrooms. One bathroom <br /> was missed in this approval. <br /> PR015/PCO15 The original scope for the project included standard closers for the exterior <br /> doors. The scope of this proposal request/change order includes at the request for School <br /> Administration the installation of"hold open" closers on 8 doors. This will allow staff to <br /> manually override the locking mechanism on certain doors and avoid doors being propped <br /> open by other means. Doors include main doors, cafeteria door, loading dock door, and similar <br /> where certain circumstances may warrant doors being open for a limited time period. <br /> PR016/PCO16 The original scope left off replacement of the exterior louvre cover for one <br /> Univent. The scope of this proposal request/change order provides the cover. <br /> Unforeseen Conditions/PCO17 The scope of this change order is for additional plumbing work <br /> required for unforeseen conditions; the work included time/material based on location of <br /> existing waste lines in plumbing chases in 5 bathrooms and time/material for connecting acid <br /> waste line in art room. <br /> The total change orders would increase to $135,372.09. <br /> Joe Brait motioned to recommend approval of Change Order No. 4; and Tom O'Neill seconded <br /> the motion. <br /> Vote: 3 Yes; Unanimous. <br /> Steve Cook,yes. Joe Brait,yes. Tom O'Neill,yes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.