My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/25/2018 AFFORDABLE HOUSING TRUST Minutes
>
6/25/2018 AFFORDABLE HOUSING TRUST Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 5:00:44 PM
Creation date
11/7/2018 10:06:47 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
AFFORDABLE HOUSING TRUST
Meeting Document Type
Minutes
Meeting Date
06/25/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> Affordable Housing Trust <br /> Minutes <br /> June 25, 2018 <br /> Discussion of Affordable Housing Feasibility Study (Phase 2) at 950 Falmouth Road; (continued) <br /> A summary of the Development Feasibility Study dated April 2018 details the design item options. <br /> However, further discussions are required, and the items should not be construed as final design. <br /> Typical scenarios as noted; <br /> Building types include; <br /> 2-Story Building 43 Residential Units 1.9 Spaces per Unit <br /> 3-Story Building 69 Residential Units 1.2 Spaces per Unit <br /> 2-2 '/2 Story Building 23 ----41 Residential Units 1.25-2.2 Spaces per Unit <br /> (up/down townhouse unix) <br /> 68—2 Bedroom Units Total Units: 34 <br /> 69— 3 Bedroom Units Total Units: 23 <br /> 68 —Mixed Bedroom Units Total Units: 29 <br /> Discussion followed with respect to the buffer between the Southcape Resort and the proposed <br /> affordable housing development. It was recommended that a naturally vegetative buffer of equal <br /> distance remain to reduce the visibility to protect the abutting Southcape Resort. Currently, the <br /> proposed buffer is 20' off the property line, 10' at its thinnest. The townhouse concept maintains a 15' <br /> buffer at its narrowest point. Upon review and consideration, the project engineer indicated that Parcel <br /> B could move forward to create an improve buffer for the Southcape residents. It was agreed the <br /> existing vegetation would be retained and enhanced with additional trees for increased visual <br /> improvement. Due to height and topography most of the structures would be visible. <br /> In terms of wastewater, Title V is required to permit the proposed development in a nitrogen sensitive <br /> area. The maximum allowable wastewater flow outlined in the preliminary feasibility study was <br /> determined to be 6,980 gallons per day (gpd) using the 550 rule under Title V regulations. The loading <br /> rate of 550 gpd per acre is applied to the total combined site acreage for all 3 lots including the stream <br /> area. Title V defines a building acre as 40,000 square feet, not 43,560 sf. <br /> Nitrogen Aggregation of Flows; <br /> Total Lot Area: 12.83 acres Building Acres: 13.85 acres <br /> Allowable Flow (gpd) 6,980 7,600 <br /> There was concern as the watershed is over compliance and the project does not comply with the no <br /> nitrogen rule. Other than Title V, the project does not include any advanced technology solutions or <br /> connection proposals with existing treatment plants to maintain zero nitrogen. It was suggested the <br /> project engineer consult the abutters, possibly the Southcape Resort to partner in wastewater treatment. <br /> It was agreed a shared system is a viable option. Mr. Kuchar was requested to calculate the number of <br /> bedrooms required in terms of flow to maintain zero nitrogen. <br />
The URL can be used to link to this page
Your browser does not support the video tag.