My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/5/2013 CAPITAL IMPROVEMENT PROGRAM Minutes
>
2/5/2013 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 5:01:56 PM
Creation date
11/14/2018 2:37:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
02/05/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br /> 5 <br /> Capital Ian m ement Program Committee <br /> Minutes <br /> February 5.2013 <br /> RECREATION: <br /> StoM.e.Shed— ��ark-$20-4000: <br /> Heidi McLaughlin was in attendance to review capital needs of the Recreation <br /> Department for fiscal year 2014. A basic ' x 14' equipment shed is proposed at <br /> ttaquin Park as the current storage facility is in disrepair. The small metal <br /> storage shed was purchased in the 1990's. A new building is necessary to secure <br /> seasonal recreational equipment at the park. <br /> It was noted the Town approved ars article last May to fund a similar shed at <br /> South Cape Town Beach at a cost of$25,000. The 'xl4' weather resit <br /> building with a garage door and overhang for sun protection was constructed ucted b <br /> the DPW for$8,000. <br /> The storage shed proposed by the Recreation Department sloes not requfre a <br /> garage door and the cost to construct the small building would most likely be <br /> considerably less. <br /> It was agreed that funding would be placed in the DPW operating budget as a <br /> separate line item for the one-time expose. <br /> 29 Passenger Bus--X49,000ffAuced <br /> *$45 00�l I <br /> The replacement of the RecreationDepartment's 1999, 15 passenger van has been <br /> an ongoing CIP request. lust year, it was reported the vehicle had 80,000 miles <br /> of wear and the floor is now visibly deteriorating. <br /> A new vehicle would allow for the continued trausportation of youth to various <br /> sites Within the'down of Mashpee and on out-of-town trips. The cost of a new <br /> passenger van has been reduced from$49,000 t $45,000. <br /> To date,the Recreation Department has expended$12,000 on ft=Vortation <br /> maces. Transportation costs are expected to increase with the upcoming <br /> Febmary and April school vacations. <br /> Catherine Latent,Director of Public Works indicated the vehicle is in need of <br /> body work and approximately$3,000 has been expended to date in short-tern <br /> repairs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.