My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/5/2013 CAPITAL IMPROVEMENT PROGRAM Minutes
>
2/5/2013 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 5:01:56 PM
Creation date
11/14/2018 2:37:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
02/05/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 <br /> CaplW hnprov meat Program Committee <br /> Minutes <br /> February 5,2013 <br /> BOAR ] OF HEALTH: <br /> Landfill Cap ftair-,, *860# <br /> The cost of$82,860-was provided by the Board of Health's consultant in 2006 t <br /> re.-grade, loan and seed the three-acre landfill. <br /> Catherine Laurent,Director of Public Works indicated the DPW conducted work <br /> at the site location last year to correct the berm darnage and, sparse vegetation <br /> with hydro-seeding.- It was also noted the solar array project was permitted by <br /> the DEP, and the solar project itself will provide for site 'improvements due to <br /> drainage impacts. <br /> It was agreed the Land. ll Cap Repair project would be deferred and taken under <br /> advisement at this time. <br /> PA. INT D PIC W_Q Q <br /> Replace 1938 Wood Brush Chip --$50,090-,. <br /> �W.I FayPI �I <br /> The Director of Public Works prioritized the purchase of a$50,000 wood/brush <br /> chipper in fiscal year 2014. The manufacturer is not conducting business and it <br /> has become difficult to obi parts. If supported in the CEP program, IVIS. <br /> Laurent indicated a leer chipper would be purchased. <br /> It was noted the older.1996 chipper is reflected in the FYI 5 capital improvement <br /> prograrn for replacement. Currently,replacement parts remain available. <br /> &eSlace 2002 E250Pick-uv Truck§_Q Q - 000: <br /> Two F250 pick-up trucks are proposed for replacement in FY14 at a cost of <br /> $35,000 each. The trucks are used daily for roadwork and snow plowing. <br /> Replace I2002 F45 0,ETruck. $45 <br /> Priority#4 is the replacement of the 2002 F450 I Ton Dump Truck used for <br /> sanding,plowing and landscaping. Ms. Laurent indicated the vehicle has had <br /> over$5,000 in repair costs,and it is hoped the truck will get through the <br /> deeds of this winter season. A 4WD 1 Ton Dump Truck would replace the <br /> agtng DPW vehicle. <br />
The URL can be used to link to this page
Your browser does not support the video tag.