Laserfiche WebLink
4 <br /> Cot unity Preservation Committee <br /> Minutes <br /> April 23,2013 <br /> SPA Application Great River float&Ma Improvements <br /> licant: a went of Public Works/Waterways Committeearborn aster: <br /> (continued) <br /> The project proposes to completely reconstruct the landing by constructing a <br /> concrete rasp. The wooden pier and attached floating docks would be widened <br /> when re-built. A new elongated dock would be constructed using more <br /> permanent materials to conform to building code requirements. - <br /> It was disclosed the"catwalk"does not extend far enough above high tide and <br /> hand rails are not adequate. The entire structure is not accessible. The floats are <br /> begi <br />