Laserfiche WebLink
Conservation Commissifon <br /> Minutes of February 2 , 2013 } <br /> Public Hearings <br /> Ma hpee Town Hall - Conference Room <br /> Commissioners: Brad Sweet, Mark Gurnee, Bob Anderson and John Rogers <br /> Staff Present: Drew McManus (Conservation Agent) and Kris Carpenter (Administrative Secretary) <br /> Call II[ etinc <br /> 0o Order: 5:55 pm <br /> The meeting was called to order with a quorum by Commissioner Brad Sweet at 5:55 pm. <br /> There was no public comment. <br /> Pre/Post Hearinci A nda: <br /> �w <br /> 1 Minutes: Approval of the following minutes: N/A—original quorum not available to approve the <br /> January 31, 2013 minutes. <br /> 2 March 1"Vista Window cutting window extended to March 151h2 2013 due to the harsh winter <br /> conditions. <br /> 3) Land Stewardship updates (Guest Lecture Series- Rick York recap) <br /> Rick York gave his presentation on his plan for shellfish propagation and nitrogen rernediation. <br /> Approximately 8-10 were present and it was also recorded for Mas hpe e TV. <br /> 4) MACC-The annual conference is scheduled for Saturday, March 2 n in Worcester ter and will contain <br /> informational courses and workshops. <br /> HEARINGS <br /> 6:00 George Ryan (160 Ninigr t Avenue)Title 5 Septic System. Existing system will be pumped, filled <br /> with sand or removed—RDA *Contin uec to March "' @ .0.3pni <br /> [4:501 Applicant has requested continuance to March 14t' due to Board of Health requirements <br /> Motion made, seconded and unanimously carried to continue to March 14, 201 at 6:6 pm <br /> 6:03 Michael Southwick (126 Shore Drive West) Remove a 44' wide pergola and a ' 15'6" pool <br /> deck.. Install 6" crushed stone (drainage), a new second story wood deck and a 1st floor <br /> Mrd deck structure to replace concrete pool slab RDA <br /> - <br /> ee Area:Buffer Zone to Coastal Bank <br /> Material submitted:Existing Landscape 2114/13 LeBlanc Builders Proposed Porch 2114113 BSS <br /> Design <br /> [6:31 Michael LeBlanc from LeBlanc Builders is presenting for the owner. Mr. LeBlanc explains that the <br /> existing pool deck has been slumping towards the house most likely due to a defective return lire. l`Illr. <br /> LeBlanc states that they are proposing to remove the second floor pergola, saw cut the existing deck and <br /> install 14 new sonotubes. The access used will be on the right side of the house which !hey would like t <br /> place ramps so that a rnini-excavator can be brought in. Mr. LeBlanc states that they would like to put a <br /> 2nd floor 15'5"x 44'deck with two sliders. They will remove the existing pavement and place crushed <br /> 1 <br />