My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/2013 CONSERVATION COMMISSION Minutes
>
12/12/2013 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 5:10:44 PM
Creation date
11/21/2018 2:53:13 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
12/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> J <br /> 4 <br /> Conservation Commission <br /> Minutes of December 12,2013 <br /> Public Hearings <br /> Mashpee Town Hall <br /> ockway Meeting Room <br /> Commissioners: John Fitzsimmons, Ralph Shaw, Mark Gurnee, John Rogers, Brad <br /> Sweet, and Louis DiMeo (Associate Member <br /> Staff Present: Drew McManus (Conservation Agent) and Judy Daigneault (Recording <br /> Secretary) <br /> Call Meetina to order: 5:55 . . <br /> The meeti ng was called to order with a quorum by Chairman John Fitzsimmons at 5:55 <br /> p.m. <br /> No public comment <br /> Pre Post Hearin _A nda: <br /> Approval of Minutes,November r 1 , 2013 <br /> Ralph Shave moved to approve the minutes,of November 14, 2013, seconded by John <br /> Rogers. vote unanimous. -o <br /> Seaside OOC extension request 12-17-13 <br /> Agent McManus referred to the request from Seaside for a second extension on their <br /> order of conditions. (reference orders: 3-2743, 3-2744 & 3-2745) <br /> Motion: Mr. Shaw moved to grant the request from Seaside village to'extend the <br /> order of conditions, Seconded by lair. Sweet. vote unanimous. -o <br /> HEARINGS: <br /> :oo Maureen B. and Robert S. Santos, 29 Timberlane Drive. Proposal to install a <br /> new Title v Septic System RDA <br /> Resource Area: Buffer'~zone to inland bank associated with S antuit Pond <br /> Materials Submitted: Plan of 29 Tlmherlane Drive, CSN Engineering Plan dated <br /> 11/1/13 <br /> Patrick Sullivan from CSN Engineering was present to represent the Santos. He <br /> explained the project was to install a new Title V Septic System. A new septic tank was <br />
The URL can be used to link to this page
Your browser does not support the video tag.