My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/2014 CONSERVATION COMMISSION Minutes
>
11/13/2014 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:10:55 PM
Creation date
11/26/2018 1:42:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/13/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission <br /> Minutes of November 1 , 2014 <br /> Public Hearings <br /> Mashpee Town Mall <br /> waguoit fleeting Roam <br /> Commissioners: John Fitzsimmons, Ralph Shaw, Brad Sweet, Mark Gurnee, John <br /> Rogers, rale McKay, Robert Anderson, Brad Sweet, and Louis Dimeo (Associate <br /> Member). <br /> Staff Present: Drew McManus Conservation Agent) and Judy l aignea It (Recording <br /> Secretary). <br /> Call Meetiniz to order: 5:55_p.m. <br /> The meeting was called to order with a quorum by Chairman John Fitzsimmons mons at 5:55 <br /> I <br /> .m. 5 <br /> I <br /> i There was no public comment. <br /> I <br /> Pre Post Hearin enda: <br /> Approval of Minutes: October 9,2014 and October 23, 2014 <br /> Motion: Mr. Shaw moved to approve the minutes of October 9, 2014 and hold the <br /> minutes of October 23, 2104, seconded by Mr. Sweet. vote unanimous 7- <br /> Administrative Review: New se bury Properties, LLC, -off seeore t Drive, <br /> Modification of DEP #sE -2768 to allow for placement oer ent f jersey barriers and/or <br /> boulders along beach during construction of permitted project and to increase slat <br /> sizes for drift fence. <br /> Tara Marden, Woods Hole Group, explained this is a request to allow the placement of <br /> I <br /> jersey barriers and boulders to set up on the beach as a wave break during construction <br /> to protect the project area. They will be removed when the project is done. The second <br /> request is to change the size of the pickets on the fence. They would like to use 1 x <br /> pickets. They have approval from Natural Heritage as long as there is two inch sparring in <br /> between the slants. <br /> The Agent confirmed he received ar letter from Natural Heritage stating they did not have <br /> I <br /> any concerns with the size of the slats in the fence but he had ar concern that it is less <br /> space overall. Tara said the U2 inch slants are like spindles and wasn't sure why the <br /> engineer put these on the plan. It is more common to use slants that are a little wider. she <br /> said it is more difficult to construct ar drift fence with 1 x2 slants. The Agent wanted to make <br /> it is known that it is a decrease in the overall space along the entire stretch by using larger <br /> pickets. He wanted to make sure that if the system fail's, this is not going to prohibit sand <br />
The URL can be used to link to this page
Your browser does not support the video tag.