My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/2014 CONSERVATION COMMISSION Minutes
>
11/13/2014 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:10:55 PM
Creation date
11/26/2018 1:42:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/13/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ti <br /> from escaping from the soft solution onto the beach to affect the coastal beach profile. <br /> Following a brief discussion, <br /> Motion: Mr. Shaw moved to approve the request for administrative approval for the <br /> New Seabury Properties, LLC, seconded by Mr. sweet. Vote unanimous 7-0 <br /> HEADINGS. <br /> 6.00 Pppnset Search Association, 0 uncle Per 's Fad. Proposed aquatic <br /> management of Dean's Pond. Continued from 6/26/2014. Applicant requests <br /> additional continuance to December 11, 2014. Nol <br /> Motion: Mr. sweet moved'-to approve the request t continue the hearing t <br /> December 11, 2014 at 6:00, seconded by Mr. Shaw. Vote unanimous - <br /> 6:03 Bayswater seaside II LLC, 42 Coastline Drive. Proposed construction of single <br /> family dwelling, swimming pool and landscaping. Continued from 9/11/2014. <br /> Not <br /> Motion: Mr. shaver moved to approve the request to continue the hearing t <br /> De mber 11, 2014 at 6:06, seconded by Mr. Sweet. Vote unanimous - <br /> 6.06 Bayswater seaside II LLC, 50 Coastline Drive. Proposed construction of single <br />' <br /> family dwel ling, swimming pool and landscaping. Continued from 9/11/2014. <br /> NO[ <br /> Motion: Mr. Shaw moved to approve the request to continue the hearing t <br /> December 11, 2014 at 6.99, seconded by Mr. sweet. Hots unanimous - <br /> 6:99 Bayswater seaside II LLC, 60 Coastline Drive. Proposed construction of single <br /> family dwelling, swimming pool and landscaping. Continued from 9/11/2014. <br /> Nol 4 <br /> Motion: Mr. Shaw moved to approve the request to continue the hearing t <br /> December 11, 2014 at 6:12, seconded by Mr. Sweet. Vote unanimous - <br /> :12 Glenn and C reen Thompson, 175 Daniels island Toad. Proposed rip rap <br /> construction. Nol <br /> Resource Area: LSDSF, Buffer Zone to salt Marsh, BVW and Land lender Ocean. <br /> Mike Borselli, Falmouth Engineering, represented Glen and Coreen Thompson. Mr. <br /> rselli explained the proposed project includes the installation of ar atone rip rap, <br /> alteration of the existing dock, regrading and reestablishment of the lawn arrears and <br /> landscaping. All of the construction will be within the buffer of the wetland resources. Mr. <br /> or elli explained the applicants acre.concerned with erosion and are proposing ar solution <br /> that would be permanent. The overall height of the wall is low profile averaging about <br /> feet of exposed wall. He said storms from certain directions do have the potential to <br /> cause erosion and it is one of the reasons several of the properties nearby have stone <br /> revetments. Mr. Borselli characterized the wall as more of ar stone wall. He said they <br /> considered a soft solution but disregarded that because more often they are doomed to <br />
The URL can be used to link to this page
Your browser does not support the video tag.