Laserfiche WebLink
Lotion: Mr. Shaw moved to continue the hearing to January 8, 2015 at 6:00 p.m. <br /> t the request of the applicant, seconded by Mr. Sweet. vote unanimous: 6-0. <br /> 6:03 Timothy and clary Jane Colton, 74 Bluff Avenue. Proposed replacement of <br /> existing deck with construction of screened porch. ICDA <br /> F sur 'Area: Buffer Zone to Lard subject to Coastal Stora Flog. <br /> Matt Costa, Cape and Islands Engineering was representing th applicants. He said the <br /> property is located in the flood zone and the proposal calls for replacement of the <br /> existing deck with a screened-in porch. The project meets the current performance <br /> standards as the project does not propose disturbance beyond any existing structural <br /> footprint. The Agent recommended a negative determination. <br /> No Comments from the public. <br /> Motion:n: Mr. shaver roved a negative determination, seconded by Mr. Sweet. vote <br /> unanimous: - . <br /> 6:06 Bayswater Seaside 11 LLC5.42 Coastline Drive. Proposed construction of single- <br /> family dwelling, swimming pool and landscaping. Continued from 911112014 to allover time <br /> for revised plans. NOI <br /> Resource Area: Buffer Zone to Coastal B nk/LSCSF/Coastal Beach. <br /> John Wadsworth was representing the applicant. Also present was Joe C lasuonne <br /> from Bayswater Development, and batt Creighton from BSC Group. Tara !Darden from <br /> the Woods Hole Group was unable to attend. Mr. Wadsworth orth suggested dealing with all <br /> four hearings at one time. Aletter was distributed from Briggs Engineering responding <br /> to the concern that there wasn't any direct potential information on the stability of the <br /> bank. The last paragraph stated that the structures will not destabilize the bank based <br /> n the existing soils and recommended construction techniques. It was decided, to <br /> y <br /> review each application individually. <br /> Mr. Wadsworth -reviewed the revised narrative submitted. Mr. Colasuonno addressed <br /> the vacant let which is part of the homeowners association and is an access to the <br /> water. The area will be used for trucks and machines. It Was noted that there will -be n _ <br /> septic systems associated with these houses as the area is already sewered. <br /> S <br /> The Agent stated the proposal meets the 50 foot setback. H also stated that more <br /> information needs to be submitted regarding the beach nourishment aspect and the <br /> homeowners' responsibility, as well as access to accommodate beach nourishment in <br /> the future when these lots are sold. lir. Clasunno said the beach nourishment will be <br /> nourishing on the easement created on Shore Drive West. The homeowners rake <br /> contributions for the nourishment. The easement is in perpetuity. Mr. Sweet wanted t <br /> make sure the conditions of nouri.shm nt are attached to the deeds. It was explained <br /> there are two gays to accomplish the beach nourishment. One is the easement that <br /> Tidewatch uses on New S abury's property and the newly created easement from Shore <br /> Drive West. Matt Creighton reviewed the mitigation plantings proposed. <br />