My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/15/2013 DESIGN REVIEW COMMITTEE Minutes
>
1/15/2013 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:02:09 PM
Creation date
11/26/2018 2:18:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/15/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
21.0owdoin Ro oni <br /> Would need septic inspection. <br /> Glen Harrington advised that if connected.to town water when building out would get additional <br /> water capacity. 1r. Fraser said if than happens he would use his well for irrigation and tern <br /> grater for building use. Glen said he made the comment because the well on the property is <br /> limited to 495 gallons/day. Mr. Fraser said he will have Mike do the calculation, but he would <br /> just as soon tie into town water. <br /> 0 Charlie I laintanis asked if there is room to put van-accessible handicap parking space.. Mr. <br /> Fraser said he could put vary-accessible parking right by the door and would still.have 12 <br /> spaces. Torn Fudala did a quick calculation and said 11 parking spaces would be required. <br /> 0 Charlie asked whether-the temporary structure in the back to remain. Mr. Fraser said he would <br /> lice to keep thea if possible. <br /> Approval of Minutes <br /> Design Review:war: Jonathan Futrbush approved the minutes of the Design Review and Flan Review <br /> le <br /> combined meeting of December 4, 2012 on behalf of Design Review Committee. <br /> Plan Review: Joyce Mason motioned to accept the minutes of the Design Review Plan Review <br /> combined meeting of December 4, 2012; Glen Harrington seconded the motion; and it was approved { <br /> by Plan Review members present with Mike Benton abstaining. <br /> dio.ur ent...This joint meeting of.Design Review r and Plan Review adjourned at 10:05 a.m. <br /> Respectfully r submitted, <br /> Jean Giliberti <br /> F.ecording Secretary <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.