My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/19/2013 DESIGN REVIEW COMMITTEE Minutes
>
3/19/2013 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:03:49 PM
Creation date
11/26/2018 2:19:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
03/19/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
736 Falmouth Road continued <br /> Glen Harrington advised the septic design needs 5 gallons per day per occupant and 2 <br /> people per class would go over the allowed maximum. Glen said to get a variance from that <br /> 600 gallons a day regulation, you would have to put in a-denitrification system. Glen explained <br /> if Crossit thinking is to expand, they may grant to think about adding the alternative system to <br /> go over boo gallons/day. With that, however,, a lifetime maintenance contract goes with it so <br /> you have to take care of it. <br /> Mary LeBlanc suggested they think about bow to male the building fagade <br /> appealing...aesthetically focus on style, colors, etc. <br /> Livia Montefor a said they are going to Cape & Islands Engineering since they did the work on <br /> the early proposal. <br /> 0 Joel Clifford noted that Frith the grade gorng up the property they should verify fire truck <br /> access. Also,, they should run the template Fire Department would provide to determine Fire <br /> Department access around the building. Joel said due to elevation, make sure access truck <br /> can make that turn. <br /> Sprinkler system—Joel oel said that depends on size of the building. <br /> Concluding: <br /> Marysuggested LeBlanc su ested before they o too far in design, nonce back for review. <br /> For review they need Plan to scale, including proposed elevations; buffers: parking spaces. <br /> Torn said it gets more complicated if you have to get variances; He said 10 foot buffer <br /> required at all sides of the property and 100 foot buffer required at the front unless waived by <br /> the permitting authority if abutting property owners give written permission. <br /> For use the Planning Board is the Special Permit authodt . <br /> Mary said eventually a Landscape Pian would be needed. <br /> Both Mark Lee and Livia rl onteforte thanked the Board for all the input. Lida Mont forte said they <br /> are willing to work the structure around the lot. <br /> Willow en <br /> Southworth l lashpee Properties, LL.0 <br /> Modification of Planning Board Special Permit <br /> Requests— sports and fitness cornple , including pool, fitness, tennis <br /> Install pavilion structure at pool deck <br /> i stall pergola structure at pool deck <br /> Alterations to interior space for a coffee/ice cream takeout station <br /> e resentative— Peter Alpert <br /> Kevin Lewis, General Manager at Willowbend Country club appeared. He said they want to build a <br /> pavilion at the pool complex,, replacing existing awning that's there. Torn Fudala advised they are <br /> corning to Planning Board meeting tomorrow night for a Site Plan change to their special Permit. <br /> Mary LeBlanc commented the Flan looks nice. Asked: Will this now be permanent. Mr. Lewis <br /> responded "yes". <br /> Toni noted the use is allowed; just site plan change. <br /> Mr. Lewis said rest rooms-are public access; are handicap accessible. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.