My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/21/2014 DESIGN REVIEW COMMITTEE Minutes
>
1/21/2014 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:02:28 PM
Creation date
11/26/2018 2:25:45 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
01/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
828 Main street(continrue l <br /> Joel Clifford stated that ars October 14, 2009 memorandum from Commonwealth of Massachusetts, <br /> Fire Safety Commission's Automatic Sprinkler Appeals Board, regarding adequate system of <br /> automatic sprinklers to be installed is where Fire Department requirements for crater come from. Joel <br /> gave a copy of the October 14th document to Marcus and Attorney Mills.,, <br /> eharlie l aintanis said this is a change in use so if you get over the hurdles.B uiIdirng Department will <br /> e looking for level of alteration and you may be required to upgrade some things you were not <br /> planning to do. He said they will be looking to the Building code. Architect or engineer would do a <br /> narrative and that would come with the building package. Charlie suggested they may want to <br /> discuss with Building Department before they apply for the Permit. He said there will also be other <br /> requirements, such as: Accessibility; Working elevators; Number of parking spaces generated, which <br /> would affect number of handicap spaces; Rest rooms with handicap access; length of travel, egress; <br /> Sprinklers. <br /> Torn Fudala said they would have to go to ZBA for Special Permit l odificabon. <br /> Marcus said he spoke with Richard regarding "Settlement House" under - and this has to be <br /> defined. <br /> Torun Mayo, Assistant Town Manager, c rr ment d that architect engineer will be involved. He said <br /> the church that was there couldn't use the building to capacity. Charlie said that's why they-will have <br /> to look at the building to figure out what can/cannot be done. Marcus said with the architect they will <br /> also bring in an engineer to loo k at everything. <br /> During the discussion, it was thought that perhaps this school would fit under 13(2). Charlie is to talk <br /> with Richard about-having it under 13(2). <br /> Aep nova l of Minutes <br /> clan ie : Glen Harrington motioned to approve the minutes of the Design Review and Flan <br /> Review combined meeting of December 13, 2013; Tom F darla seconded the motion, and it was <br /> approved by Plan Review, with Michael Benton and ,noel CI ff rd abstaining. <br /> A0jo umment., This joint meeting of Design Review and Plan Review adjourned at 9:40 a <br /> Respectfully submitted <br /> ,1 Giliberti <br /> cording Secretary <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.