My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/7/2014 DESIGN REVIEW COMMITTEE Minutes
>
10/7/2014 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2018 5:08:56 PM
Creation date
11/26/2018 2:30:29 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/07/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Northbridge Mashoee Commons Lcontinuepi <br /> They-have not looked at snow storage. They said potentially they could use area designated <br /> for parking or one area along the access driveway. They will store on-site so it will not melt <br /> and enter the storm water system. Mike Mendoza a asked therm to show proposed snow <br /> storage location on Site Plan. <br /> Catherine Laurent asked whether parking space will be available for community use. Ray <br /> Mitrano said they do community events during off-hours; 30-40 people attend so plenty of <br /> parking spaces would be available. <br /> No liquor license—liquor served as part of dining program. <br /> No pharmacy on site. <br /> Veronica Marden addressed the points presented by Glen Harrington in .bis e-mail (copy of <br /> which is attached to the printed set of these minutes). Ray 11itrano said they will have large <br /> food scrapper, composting, -and recycling bins and definitely will-meet the food waste <br /> regulations. Veronica advised that food service establishment permit and certified food <br /> manager's.certificate will be required: They will do. <br /> Catherine Laurent stated the Plan shows a duster pad but doesn't reference recycling.or <br /> compost area. They will note on the Plan. <br /> Catherine said they previously talked-moot a pedestrian accommodation-to tie into the existing <br /> multi-use path that's already on Great Neck Road South. Some sort of sidewalk that ties into <br /> that path which intersects at Donna's Lane would probably b .appropriate. Ray ll itrano said <br /> hop efuily-they wiil make the-connection to Mash pee Corn mo ns property,, but is.open to <br /> discussion at this time. <br /> 0 Catherine asked ghat is being proposed for buffer/vegetation along Great back Road South. <br /> Response: they are.still resolving landscaping. They will be supplementing with appropriate <br /> vegetation. <br /> 9 Signage – Sign mould be at front of location, but still don't have plan for a sign. <br /> Torn Fudal.a said the text says new sidewalk in front, but not shown on Site Plan. They said <br /> text wrong they are not planning,a sidewalk, just pathway. However, they will look to do the <br /> sidewalk.. <br /> Tori Fudala noted they have to meet Mashpee Zoning store waterBy-Laws which they are <br /> not doing so have to revise Plan. <br /> a Torn Fudala voiced concern.about relocation of the driveway. They said they ran turning <br /> software but will redo with Fire Department template. <br /> 0 Fenced dumpster in easement area. <br /> e -Torn Fudala advised that the Planning-Board engineer pointed out a number of issues <br /> involving parking, dumpster, vegetated buffer, etc. all on C&V Electric easement. Question: <br /> Do you have written permission from NStar -Tom suggested they talk directly to I Star. He <br /> said this is a serious issue; their permission needed to do what you want to do on their <br /> easement. <br /> Joseph Cummings also stressed that l Star has.requirements regarding easements and <br /> strongly suggested importance of getting their written permission beforehand. <br /> bo' buffer should be undisturbed, natural buffer...so rethink what to do there. <br /> Tom Fudala said roof run-off/parking run-off cannot go into ground....that is illegal. <br /> 4 <br /> No lighting Plan done yet. <br /> Elevator size is standard; they have no rescue plan. They will do handrails around the roof <br /> courtyard as suggested by Joel Clifford. <br /> .noel pointed out that EDA System antenna is.needed. They are aware of this: <br />
The URL can be used to link to this page
Your browser does not support the video tag.