Laserfiche WebLink
Southworth Mashpae Properties, ILC <br /> Simons Road <br /> Request for-modification of Special Permit Planning Board) <br /> Addition of 3 free-standing garages (17 parking spaces) <br /> Representative — Matt Eddy. <br /> Ilatt Eddy and Rya n Southworth appeared. Matt said this is the Willorbend project. Proposing <br /> adding 3 garage buildings since condo buildings d .not come Fr ith garage. He shored Site map for <br /> -garage I.ocations and analysis for storm-rater management. <br /> �ment. <br /> Ryan southworth.sald the garage-buildings will match materials, doors, ridge vents, etc. to tie into the <br /> rest of WiIlowbend. They will co e'r sewer manhole just to protect it during construction. <br /> Tom Fudarlar advised that the Planning Board agreed that this request does not need.a Public <br /> Hearing. It will be modification 31 to 11 illowbend Special Permit. <br /> Motion: Glen Harrington motioned.to.approve as presented. Scott Carline seconded this motion; <br /> and the-motion unanimously passed. <br /> Approval of Minutes <br /> Plan Review: Torn 'Fudala motioned to approve the minutes of the Design Review and Dian Review <br /> combined meeting of September 16, 2014 as presented. Scott Carline seconded this motion; and it <br /> was approved by Flan Review, with Catherine Laurent and Joyce Mason abstaining. <br /> Torn Fudarla motioned to approve the. minutes of the Design Review and Plan Review combined <br /> meeting.of October 7, 2014 asresented. Joel Clifford seconded this motion; and it was approved bar <br /> p r <br /> Plan Review,iew, Frith.Glen Harrington-, Joyoe Mason, Drew McManus, and Scott Carline abstaining. <br /> Design view: - Joseph Cummings motioned to accept the minutes of the Design Review r and Flan <br /> 'Review combined meeting of October 7, 2014. Jonatharn 'Furbush seconded this motion; and it was <br /> approved by Design Review. _ <br /> , i r e t...T is joint meeting of Design Review .and Plan Review: adjourned-by Plan Review <br /> at 11:55 a.m. The Desig n Review Commi tee is to continue in a reg u lar Design Review meeting... <br /> • 1 <br /> I . <br /> Respectfully submitted <br /> I <br /> G!ing <br /> iiberi <br /> cor Secretary <br />