My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/6/2018 DESIGN REVIEW COMMITTEE Minutes
>
11/6/2018 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2018 5:00:51 PM
Creation date
11/28/2018 9:37:19 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/06/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,«� ; Town of Mampe <br /> ��Z�k� ,r��yg <br /> ��?3: �� .. I�isltj�:(:-, Ir[s ct�lt:►asctt, 02649 <br /> Minutes of Meeting of <br /> Design Review Committee <br /> Held Tuesday, November 6, 2018 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Design Review Committee Members Present: Michael Mendoza, Bill Blaisdell, and Joe <br /> Cummings. <br /> Absent: Joshua Spencer and Miles Peterson <br /> Mike Mendoza called the meeting to order at 8:40 am. <br /> CONTINUED HEARING <br /> Prosect: RCA Electrical Contractors Inc. <br /> Proiect Address: 20 Evergreen Circle <br /> Owner/Agent: Evergreen Energy, ILL.0 as owner <br /> Arch itect/Encineer: Dan Ojala, Down Cape Engineering <br /> Contractor: Joao Junqueira, Cape Wide Construction <br /> Requests_: Proposed office and electrical shop in 7,320 sq. ft. Building and warehouse <br /> storage in 2,400 sq. ft. building. <br /> (Continued from October 16, 2098) <br /> At the last hearing, the committee requested the following information; copulas, window <br /> changes, shutter changes, building signage, and lighting on the buildings. <br /> Mr. Junqueira handed out the updated information to the committee as requested. He said <br /> he also had a drawing with the street sign, and showing the size of the roof with the copulas. <br /> Joe Cummings did not have any comments. <br /> Dan Ojala, with Down Cape Engineering handed out the revised site plan. He revised the <br /> lighting plan adding three full mounted lights that were shown earlier. He placed the septic <br /> structures 10 ft. apart as requested by Glen Harrington, Health Agent, and added some <br /> evergreen screening next to the fenced area to the East of the smaller building. Added <br /> some smaller shrubs around the site to buildings to clean up the look. He also added the <br /> fencing around the concrete pad for the dumpster as requested by the Fire Department. <br /> He also added a foot path on the West side and around the building that can be accessed <br /> year round. For the record, the site plan was updated November 6, 2018. <br /> Mr. Mendoza said that the Fire Department had concerns about possible access into the <br /> fenced in area. <br /> Mr. Ojala said they added a large gate that will have a padlock, and he will give the Fire <br /> Department a key. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.