My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/14/2018 ZONING BOARD OF APPEALS Minutes
>
11/14/2018 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 5:01:26 PM
Creation date
11/29/2018 2:55:32 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
11/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> NOVEMBER 14,2018 <br /> Mr. Sullivan stated that he does not plan to put any heat in that space and they would drain <br /> the system for the winter. <br /> Mr. Pittsley commented that if he doesn't see an issue if in fact it winterized. <br /> Mr. Gould commented that he doesn't have an issue if it is used for storage. <br /> Mr. Bonvie said that he is not in favor of the Administrative Appeal. <br /> Mr. Blaisdell said that he would agree if the applicant does file a covenant with the registry <br /> of deeds. This was never mentioned in the past. <br /> Mr. Sullivan said that the garage bathroom will be tied into the existing septic system.. <br /> There's only one septic system. <br /> Mr.Dan Oj ala,with Down Cape Engineering had a comment that without heat there cannot <br /> be a bedroom. <br /> Mr. Furbush read the Conservation comments into the record. <br /> Sharon read the Inspection Department comments into the record. <br /> The Board wanted clarification regarding the building permit for the garage and when the <br /> construction started. They also wanted to know if the original plans depicted the bathroom. <br /> Mr. Sullivan said he was informed by his builder that the project would require a ZBA <br /> filing. He was not involved in the permitting process at all and had his builder handle the <br /> submittal for hire. <br /> Mr. Mendoza addressed the Board and stated that the applicant has a permit on site to <br /> construct the garage. The reason this application is in front of the ZBA is for an <br /> Administrative Appeal, is regarding having a full bathroom and shower on the second floor <br /> of the garage and if that doesn't succeed then the next step as he mentioned to the applicant <br /> when they met is that the Board makes a determination for a Written Finding. <br /> Mr. Gould asked the applicant if it would matter to him if he leaves out the shower. Mr. <br /> Sullivan said he would rather keep the shower. <br /> There were no more comments from the audience or the Board. <br /> Mr.Bonvie made a motion to approve the Administrative Appeal to E.Michael and Arlene <br /> Sullivan Administrative Appeal of the Building Commissioner's Decision under M.G.L. <br /> Chapter 40A §§8.and 15 concerning construction of a lavatory in a detached garage on <br /> property located in an R-3 Zoning District, (Map 125 Parcel 256), Mashpee,MA. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.