Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> RCA Electrical Contractors <br /> (Owner of record: Evergreen Energy, LLC) <br /> 588 Main Street(20 Evergreen Circle) (Map 19 Parcel 10-2) <br /> Mashpee, MA 02649 <br /> SP-2018-48 <br /> In view of the foregoing, the Board determined the Petitioner met the criteria for a <br /> Special Permit. Upon motion duly made and seconded at the Public Hearings on <br /> Wednesday,November 14,2018,the Zoning Board of Appeals voted unanimously to issue <br /> RCA Electrical Contractors a Special Permit under §174-25 (G) (4) and (G) (6) of the <br /> Zoning Bylaws to allow for construction of a 7,320 sq. ft. industrial building to be utilized <br /> as an electrical shop and office, and a 2,400 sq. ft. industrial warehouse storage building <br /> on property located in an I-1 Zoning District, (Map 19, Parcel 10-2), Mashpee, MA. <br /> (Owner of Record: Evergreen Energy, LLC) with the following conditions; <br /> 1. The Board has determined that the applicant meets all the conditions of a Special <br /> Permit under Mass General Law 40A Section 9. <br /> 2. Site Plan — 20 Evergreen Circle, Mashpee, MA. Prepared for Capewide <br /> Construction/RCA Generators & Electrical Contractors Inc., Date: September 12, <br /> 2018, Revised: November 6, 2018 (Per Town Review, Lights), Scale: 1" = 20', <br /> Signed by: Dan Ojala, Civil Engineer,No. 46502, Sheet 1 of 2, Detail Sheet 2 of 2. <br /> Owner of record: Evergreen Energy, LLC. <br /> 3. Building Plan ---- Morton Buildings, Inc. -- Building #1 Specifications. Style 306, <br /> Width, 60', Height 18', Length 122', Truss Spacing 8', Roof Pitch 4/12, Lower <br /> Chord 0/12, Peak Height 29' 6.5", Soffit Height 18' 9". Pages 1 of 7, Submitted <br /> by: Steven Marino, Sales Consultant. <br /> 4. Drainage Calculations: 20 Evergreen Circle, Prepared by: Down Cape <br /> Engineering, Proposed Building and Parking Lot, Mashpee, MA. Dated: 9-13- <br /> 2018,Prepared for: Capewide Construction. Signed by: Dan Ojala, Civil Engineer, <br /> No. 46502. <br /> 5. Conditioned on all Town Department comments read into the record. <br /> 6. Conditioned that the pians are reviewed and approved by Charlies Rowley, <br /> Consulting Engineer. That all fees will be paid by the applicant prior to the <br /> issuance of a building pen-nit. <br /> 7. Conditioned that any changes or alterations made to the specified use to either <br /> building shall be approved by the Zoning Board of Appeals. <br /> 8. Conditioned upon, no building permits will be issued until the Building <br /> Commissioner receives confirmation in writing from the Planning Board that cash, <br /> security, or performance bond was posted and the lots have been released. <br /> 3 <br />