My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/20/2011 SEWER COMMISSION Minutes
>
1/20/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2020 11:21:38 AM
Creation date
1/2/2019 1:47:56 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/20/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLIENTSIPEOPLEIPERFORMANCE MONTHLY PROGRESS REPORT <br /> TOWN OF MASHPEE <br /> INVOICE <br /> (WORK FROM 11-19-10 TO 12-20-10) <br /> In accordance with Article 7.2 of our Agreement with the Town of Mashpee dated February 2, 2000, GHD Inc. <br /> submits the following monthly report for invoice services rendered. <br /> Work completed since the last invoice period as summarized on the Budget Summary <br /> Task Description of Work Performed <br /> Effort during the past month has included attendance at Sewer Commission Meetings, four <br /> meetings regarding public participation and a site visit to the transfer station (Site 4). The <br /> focus has continued to be reviewing the findings of the scenario runs and the development of <br /> final two (2) scenarios. <br /> RVA, our public relations sub, has also begun work during this time in developing the web <br /> page and meeting with the public relations group to develop a plan for addressing some of <br /> the public relation needs of the project. <br /> Based on the scope items, effort is being billed in the following locations: <br /> • Task 4E — related to receipt of direction and comments regarding the next phase of <br /> scenario development <br /> • Tasks 5C—Scenario detailed evaluation <br /> • Task 6A development of the recommended plan <br /> • Task 6G- Meeting attendance <br /> • Task 7L Subsurface investigations as we contract and begin site work at Site 4 <br /> • Task 8B Alternatives Screening Analysis Report — this will be where we will be <br /> combining the findings from our Draft report and the next scenario evaluations. <br /> Adequacy of fees remaining: <br /> Budget remains tight and we will continue to monitor the budget and work to be as efficient as possible; however, <br /> impacts resulting from a prolonged project timeline due to numerous factors have forced us to use up budget <br /> necessary to complete scoped tasks. Issues regarding funding for meetings have been identified previously. As <br /> stated previously there are no specific scope items regarding management of data requests (USGS, LAI, MEP), <br /> and therefore, that effort had to be billed under existing tasks where deemed most appropriate, however this has an <br /> impact on our project budget. <br /> We would appreciate the opportunity to recover the costs for additional meetings, data requests, and prolonged <br /> project time frame as stated above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.