Laserfiche WebLink
�^ MONTHLY PROGRESS REPORT <br /> u PAGE 2 <br /> Ability to meet the Work Schedule <br /> Status remains the same. <br /> Meeting Summary <br /> Due to the time lapse in the original project schedule and the constraints of the original budget, under which <br /> meetings were allocated, meeting attendance will be tracked through current budgeted tasks (4D, 5D, 6C, 6G, 7D & <br /> E, 7H & I, 7K) instead of the table originally created as part of these progress reports, As they are not specifically <br /> called out in number in the contract, we will no longer track them as such. We will notify the client promptly if it is <br /> identified that there is a project related meeting that the Commission wishes us to attend that was not specifically <br /> identified as part of the scoped project such that these costs can be recovered. <br /> Because significant planning decisions are being made at the most current sewer commission meetings, GHD <br /> understands the importance of attending these meetings. However, this does have an impact on our budget. <br /> GA86\12001\PM-NCW\Invoice Items\Monlhly Reports\2010\21st-2010(through 12-20-10)\Mashpee MR through 12-20-10:doc <br />