My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/21/2011 SEWER COMMISSION Minutes
>
6/21/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 9:59:11 AM
Creation date
1/2/2019 1:52:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Figure 2. Based on four test runs, the average infiltration rates in gpd/sf for Basin Number 1 was 972 gpd/sf; <br /> and based on five test runs, the average was 998 gpd/sf for Basin Number 2. The average result over both <br /> sites was 986 gpd/sf. Using the EPA criteria of 10 percent of the average infiltration test rate, a design <br /> loading rate of 98 gpd/sf is calculated. <br /> 3.4 Mounding Impacts <br /> Two observation wells were located in close proximity to the test basins. The water levels in these wells were <br /> monitored throughout the three days of testing at each location. Water level data is depicted graphically on <br /> Figure 3. <br /> There was minimal precipitation during the testing, which was initiated on April 18, 2011. Table 1 includes <br /> precipitation data for the testing period. However, the month of April saw higher than average rainfalls. <br /> Rainfall for the month of April totaled 5.40 inches, whereas the average rainfall for April is 4.25 inches <br /> (www.weather.com). Due to the excessive rain, the water tables may have been higher than normal. <br /> A rise of 2 to 2.5 feet in the water table elevation immediately adjacent to the test basins can be seen over <br /> the course of the three days of testing. The water level in the background well also rose approximately 0.5 <br /> feet over the course of the test, although this was not likely a result of the testing, as can be seen from the <br /> rising levels beginning prior to the start of the testing. A mounding analysis will be performed and the results <br /> will be incorporated into the WNMP. <br /> 4 TEST SUMMARY AND CONCLUSIONS <br /> Hydraulic loading tests were completed between April 18 and April 22, 2011. Testing was performed at two <br /> 10-foot basins. Testing was comprised of: <br /> 1. One day of saturating the soils beneath the basins for a 24-hour period by sustaining a water level in <br /> the basins equivalent to what was infiltrating out of them. <br /> 2. One day of constant head testing, during which water was fed to the basin at the same rate that <br /> water drained from the basin, as indicated by a constant water level in the basin. <br /> 3. One day of falling head testing, recording the rate at which the water level in the basins dropped. <br /> This was repeated six times. <br /> For the constant head testing, an average infiltration rate of 715 gpd/sf for the two basins was calculated. <br /> Applying the USEPA design factor of 10 percent to that result, an appropriate design loading rate is 72 <br /> gpd/sf. <br /> In the falling head testing, an average infiltration rate of 986 gpd/sf for the two basins was calculated. If this <br /> rate is used and the USEPA design factor of 10 percent is applied to that result, this would equal a design <br /> loading rate of 98 gpd/sf for the site. As part of completing their WNMP, the Town needs to estimate <br /> capacities for any potential future recharge facilities. The Town will be able to save significant amounts of <br /> money if it can avoid having to build redundant infiltration beds that would be based on an overly <br /> conservative design rate of 5 gpd/sf. <br /> Based on the USEPA guidance for acceptable loading rates for use in design, (10% of the observed rate) it <br /> is the recommendation that these findings be reviewed with MassDEP in order to establish an agreed upon <br /> loading rate for the site between the State valued of 5 gpd/sf and the observed 70 gpd/sf. <br /> GA86\12001\Hydraulic Load Tests\Tech Memo\DRAFT Site 4 Load Test 2011.DOC 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.