Laserfiche WebLink
TABLE 1 <br /> TOWN OF MASHPEE <br /> HYDRAULIC LOADING TESTS <br /> TESTING SCHEDULE <br /> Friday Monday Tuesday Wednesday Thursday Friday <br /> 4/8/2011 1 4/11/2011 4/12/2011 40646 40647 4/15/2011 <br /> Monitoring Well Installation <br /> Test Pits <br /> Basins Excavated and Set U <br /> Temporary <br /> Piping Set U <br /> Monday Tuesday Wednesday Thursday Friday <br /> 4/18/2011 4/19/2011 4/20/2011 4/21/2011 4/22/2011 <br /> Constant Head Falling Head <br /> Test Basin#1 Saturation Test Test <br /> Constant Head Falling Head <br /> Test Basin#2 Saturation Test Test <br /> Preci itation 1 0.04" 0.01" <br /> G:\86\12001\Hydraulic Load Tests\Data\Test Data.xls <br /> DRAFT Report <br />