My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/28/2018 ZONING BOARD OF APPEALS ZBA Decision
>
11/28/2018 ZONING BOARD OF APPEALS ZBA Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:41:48 PM
Creation date
1/9/2019 1:40:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
ZBA Decision
Meeting Date
11/28/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEAL <br /> DECISION FOR A SPECIAL PERMIT <br /> Petitioner,, Cape Cod Dog Center, Inc. <br /> (Owner of record: Evergreen Energy LL <br /> 588 Main Street 31 Evergreen Circle) <br /> l ashpee, MA 02649 <br /> SP-2018-54 <br /> . Site plan—Proposed Commercial Development prepared for Cape Cod Dog Center, <br /> Lot 2 ##31 Evergreen Circle, Mashpee, MA. Seale: I"' = 20", Date: Oct. 3, 2018, <br /> Holmes and McGrath, Inc., Drawn: LAC, Checked: MM, Job No.: 218251, Dwg. <br /> No.: 8-7-985 Sheet I of 5, Revision date+ 10/10/18, Revise walkway, Concrete <br /> Curbing, Revised. 10119/18 Add Business Sip with detail, Revised I 1/14/18 Add <br /> Roof overhang, update zoning nates add ' high chain link fence. Drawn: LAC, <br /> Checked b + MM, Signed by: Michael B. McGrath, Registered professional <br /> Surveyor. Sheet : Grading, Drainage, Utilities & Erosion Control plan, Sheet 3: <br /> Septic System Construction Details, Sheet 4: Ruck Filter Details, Sheet 5: General <br /> Construction Details. <br /> 3. Conditioned on Exhibit potential Snow Removal Areas. Sheet 1 of I prepared for <br /> Cape Cod Dog Center. #31 Evergreen Circle, Mashpee,MA,Holmes and McGrath <br /> Inc. Civil Engineer and Land Surveyors,, <br /> 4. Conditioned on all Town. Department comments read into the record. <br /> . Conditioned on Charles Rowley, Consulting Town Engineer comments into the <br /> record;and his cost estimate $1,050 to be billed by the Town to the petitioner, and <br /> paid by the petitioner. Charles Rowley to review the system drainage plan. <br /> 6. Conditioned on Board of Health approved septic and waste removal system plan. <br /> 7. Conditioned upon submission of a snow removal plan. <br /> 8. Conditioned that there are no overnight employees. <br /> . Conditioned upon reducing the 8 ft. buffer on Evergreen Circle. <br /> 10. Conditioned upon drop-off and pick-up signs for parking in the front only. The <br /> front parking is temporary, and a sign to be placed in each parking slot to indicate <br /> R. 'I's temporar parking only, and that the Zoning Board of Appeals recognizes the <br /> official parking requirements are net at the rear of the building. <br /> 11. Conditioned that the Board recognizes that this project is in construction phases. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.