My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/14/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
01/14/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 5:02:46 PM
Creation date
1/25/2019 11:04:46 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
01/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Continue development of Regional Memorandums of Understanding (this will also influence long- <br /> term implementation of areas within the neighboring communities). <br /> ® Fertilizer management bylaw implementation. <br /> • Continued use of stormwater BMPs. <br /> The following Phases 1 through 5 (divided into 5-year increments) are depicted in Figure ES-2 and were <br /> included in various phases based on considerations for areas targeted for shellfish and on each subarea's <br /> relative rankings established in Chapter 4 (Table 4-22). <br /> 2017-2021: Phase 1 <br /> • File Notices of Project Change and development of Regional Impact (DRI) modifications (as <br /> needed/if required) to inform (and gain approval from) the environmental review process on the <br /> agreements and funding that will allow the next steps to proceed. <br /> • Shellfish Propagation expansion in related sections of Popponesset Bay and addition in Jehu <br /> Pond and Hamblin Pond). <br /> • Feasibility Study: Implementing Soft Solutions for Restoring the Quash net/Moo nakis River. <br /> • Feasibility study on connection of Quashnet and Coombs Schools to Mashpee Commons WWTF. <br /> • Implement findings of Quashnet/Moonakis River soft solutions (if favorable). <br /> Design and Construction of Site 4 facility (Phase 1) to serve sections of Subarea S (within <br /> Mashpee River Watershed) adjacent to Falmouth Road/Route 28. <br /> • Design and Construction of related collection system to serve Site 4 WWTF. <br /> • Design and Construction of collection system to extend to properties neighboring the Wampanoag <br /> WWTF. <br /> • End of Phase compliance reporting—consider updating MEP Model runs (landuse and <br /> hydrodynamic models) and MEP calibrate with water quality and benthic flux sampling as needed. <br /> • Determine additional evaluations of existing wastewater treatment facilities leading into next <br /> phase of proposed improvements. <br /> • Coordinate with 208 Plan and potentially run CCC MVP tool in conjunction with MEP Model runs <br /> to check on updated water data and possible adaptive management approaches. <br /> The estimated cost for Phase 1 infrastructure and long-term shellfish implementation is summarized in <br /> Table ES-4. <br /> (continued) <br /> 8612001 A Town of Mashpee Sewer Commission ES-13 <br /> Final Recommended Plan/Final Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.