Laserfiche WebLink
r <br /> 4 I;� <br /> iii. Possible need to relocate recharge to Site 7/New Seabury depending on results of <br /> shellfish propagation. <br /> d. Mashpee High School—expand (as alternative to Back Road WWTF) or pump to either JBCC <br /> or Back Road Site (which is the fallback to JBCC). <br /> e. Cotuit Meadows: <br /> I. Potential extension of service area to pick up flow from adjacent areas. <br /> f. Wampanoag Village: <br /> L Potential extension of service area to pick up flow from adjacent areas. <br /> 5. Wastewater Treatment at Existing WWTFs: Operating under existing permit, consider upgrade to <br /> improve performance (3 to 6 mg/L TN) based on shellfish results and other adaptive management <br /> programs: <br /> a. Forestdale School. <br /> b. Mashpee Village, Subarea G (to be constructed); if JBCC is not an option for other Subareas <br /> within the Quashnet River watershed, flow from this facility must be treated to 3 mg/L TN and <br /> recharged at Back Road Site. <br /> C. Southport—If JBCC is not an option, must be recharged at Back Road Site. <br /> d. South Cape Village. <br /> e. Stratford Ponds. <br /> f. Windchime Point. <br /> 6. Coordination with Adjoining Towns within the planning area with recharge outside the watershed <br /> (collection, treatment, and recharge): <br /> a. Barnstable. Barn-37, -38, -39, -42. <br /> b. Falmouth: Fal-13 through -17—see JBCC option. <br /> c. Sandwich: Sand-4, -5, -6, and -8. <br /> 7. No change of the following current practices: <br /> a. Mashpee I/A facilities. <br /> b. Mashpee septic systems. <br /> c. Sandwich septic systems. <br /> d. Barnstable septic systems. <br /> e. Falmouth septic systems. <br /> 8. Coordination with the Following Future Demonstration Projects/Evaluations: <br /> s PRB Options (following Falmouth demonstration efforts). <br /> Wetland restoration projects. <br /> Feasibility Study for Quashnet/Moonakis River. <br /> 9. Coordination with the Cape Cod 208 Planning Efforts. <br /> 8612001.4 Town of Mashpee Sewer Commission ES-7 <br /> Final Recommended Flan/Final Environmental Impact Report <br />