Laserfiche WebLink
r r Pr ,IV A <br /> ES.5.1 Cost Summary <br /> Table ES-2 Estimated Total Capital Cast of Entire Recommended Plan With and Without <br /> Shellfish at Build-out <br /> Recommended Plan with Recommended Plan without Shellfish <br /> Estimated Capital Casts Shellfish Aqua ulture A uaculture <br /> Town of Mashpee Estimate <br /> -- ..........._.................................................................... <br /> Shellfish Aquaculture (yr 1)(7) $1,300,000 $0 <br /> Collection System $120,000,000 $170,000,000 <br /> .....___.........__- <br /> Treatment System $32,000,000 $66,000,000 <br /> Recharge Facility $5,400,000 $13,000„000 <br /> Mashpee Total $160,000,000 $250,000,000 <br /> Neighboring Towns Estimate (Barnstable, Falmouth, Sandwich)? <br /> Shellfish Aquaculture (yr 1)('' $200,000 $0 <br /> Collection System $53,000,000 $ 80,000„000 <br /> -_--------_-_ <br /> Treatment System (3'4,5) $8,700,000 $23,000,000 <br /> Recharge Facility(3.4) $300,000 $2,000,000 <br /> Neighboring Town Total $62,000,000 $110,000,000 <br /> Total $220,000.000 $ 360,000,000 <br /> Notes: <br /> 1. Values are rounded to two significant figures and include allowances for fiscal, legal and engineering services, and <br /> contingency. <br /> 2. Values are based on an ENR index year of 2017 and are based on future flaw conditions and TMDL compliance. <br /> 3. Treatment costs include new facilities and improvements/upgrades to existing facilities, including allowances for facilities <br /> located in Sandwich(not including those proposed to connect to JBCC), and Barnstable(Falmouth assumed to go to JBCC. <br /> 4. For neighboring communities of Barnstable, Falmouth, and Sandwich, collection, treatment, and recharge costs were <br /> estimated for planning purposes only; actual location, technology type, and site considerations would need to be determined <br /> by each individual community. <br /> 5. Estimated costs with shellfish aquaculture presume that existing and future loads are managed through this adaptive <br /> management approach;that Joint Base Cape Cod is available,and no additional recharge capacity is required at JBCC. <br /> 6. Does not consider increasing shellfish aquaculture areas to reduce sewering if shellfish performance is as good as or better <br /> than projected. <br /> 7. Includes potential cost sharing of shellfish aquaculture projects. <br /> 8612001.4 Town of Mashpee Sewer Commission ES-8 <br /> Final Recommended Plan/Final Environmental Impact Report <br />