My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/15/2019 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2010-2019
>
2019
>
01/15/2019 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 5:03:43 PM
Creation date
1/25/2019 11:05:24 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
01/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 U I <br /> fa I v=l <br /> – New Seabury recharge facilities construction to support treated effluent from Mashpee <br /> Commons and Site 6. <br /> – Barnstable and Sandwich to begin provisions to address their remaining portions of the <br /> Popponesset Bay Watersheds. <br /> • End of Phase compliance reporting—consider updating MEP Model runs (landuse and <br /> hydrodynamic models) and MEP calibrate with water quality and benthic flux sampling as needed. <br /> • Coordinate with 208 Plan and potentially run CCC MVP tool in conjunction with MEP Model runs <br /> to check on updated water data and possible adaptive management approaches. <br /> • Determine additional evaluations of existing wastewater treatment facilities leading into next <br /> phase of proposed improvements. <br /> 2032-2036: Phase 4 <br /> • File Notices of Project Change and DRI modifications (as necessary) to inform (and gain approval <br /> from) the environmental review process on the agreements and funding that will allow the next <br /> steps to proceed. <br /> • Upgrade of Cotllit Meadows and Wampanoag Village to improve nitrogen removal performance <br /> (dependent on MEP modeling results and permit requirements). <br /> • If shellfish propagation continues to lag or is not advancing as fast or to the levels anticipated: <br /> -- Site 6 facility expansion with associated sewer extensions to serve Hamblin/Jehu Pond areas <br /> of Mashpee. <br /> – Collection system expansion to Site 6. <br /> Collection system expansion on Creat Neck Road North to Mashpee Commons, <br /> Collection system expansion for Hamblin and Jehu Pond Areas, upgrade/expansion of New <br /> Seabury WWTF. <br /> • End of Phase compliance reporting----consider updating MEP Model runs (landuse and <br /> hydrodynamic models) and MEP calibrate with water quality and benthic flux sampling as needed. <br /> • Coordinate with 208 Plan and potentially run CCC MVP tool in conjunction with MEP Model runs <br /> to check on updated water data and possible adaptive management approaches. <br /> • Determine additional evaluations of existing wastewater treatment facilities leading into next <br /> phase of proposed improvements. <br /> 2037-2041: Phase 5 <br /> • File Notices of Project Change and DRI modifications (as necessary) to inform (and gain approval <br /> from) the environmental review process on the agreements and funding that will allow the next <br /> steps to proceed. <br /> • If shellfish propagation continues to lag or is not advancing as fast or to the levels anticipated: <br /> – Remaining wastewater nitrogen from Barnstable (B-37 and parts of B-38) and Sandwich <br /> Subareas (Sand-4, -5, and -6) within the Popponsesset Bay watersheds will need to be <br /> 8612001.4 Town of Mashpee Sewer Commission ES-16 <br /> Final Recommended Flan/Final Environmental impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.