My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/24/1997 BOARD OF SELECTMEN Minutes
>
2/24/1997 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 1:00:42 PM
Creation date
1/30/2019 12:59:47 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
02/24/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page <br /> 4, F • <br /> 7 <br /> a <br /> Board of Selectmen <br /> Minute <br /> February 24, 1997 <br /> APPOINTMENTS AND SARI G S; <br /> L!Uartment f En ' nmental Protection: (continued) <br /> The entire length of the plume was outlined,and a Response Action <br /> Outcome (RAO) was submitted for the site. Mr. wood identified the <br /> components of the project. <br /> Phase IPrelu*Al nary Assessment <br /> Phase II Comprehensive Site Assessment <br /> Defines horizontal and vertical extent of contamination <br /> (7000' horizontal, and 1 ' vertical) <br /> Risk Assessment, <br /> Evaluate risk of harm imposed if any to health, safety, <br /> and public welfare <br /> Characterizes existing and potential exposure pathways <br /> Characterized all potential human and environmental <br /> receptors <br /> Evaluates where contaminants are going; transport <br /> Evaluates fate and deterrnines action if necessary <br /> Results of the assessment give the basis to determine <br /> whether action is necessary <br /> Phase IR Identifies potential remediation alternatives <br /> Evaluates and chooses one <br /> Class C Response Action Outcome: <br /> .� <br /> No substantial hazard remains on site <br /> Periodic evaluation of the solution <br /> Requires copy of a plan to achieve a pennanent solution <br /> Requires description of any operation and maintenance <br /> Requires monitoring <br /> At the end of the review of Augat's proposal, DEP will review the <br /> appropriateness of the Risk Assessment, and determine if additional <br /> work is needed or if a temporary solution has been reached indicated <br /> Mr. wood. <br /> Ms.Papadopoulos indicated that the Southeastern Regional DEP Office <br /> will consider public input while they are conducting the research and <br /> review of the Risk Assessment. It was noted that the process <br /> will take approximately one month to complete. <br /> Jeff Davis,counsel for the Augt facility indicated that his client is proud <br /> of what has been accomplished to date. Mr. wood agreed,and stated that <br /> Augat has responded and complied with all of the requirements in a <br /> timely fashion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.