Laserfiche WebLink
Page <br /> 4, F • <br /> 7 <br /> a <br /> Board of Selectmen <br /> Minute <br /> February 24, 1997 <br /> APPOINTMENTS AND SARI G S; <br /> L!Uartment f En ' nmental Protection: (continued) <br /> The entire length of the plume was outlined,and a Response Action <br /> Outcome (RAO) was submitted for the site. Mr. wood identified the <br /> components of the project. <br /> Phase IPrelu*Al nary Assessment <br /> Phase II Comprehensive Site Assessment <br /> Defines horizontal and vertical extent of contamination <br /> (7000' horizontal, and 1 ' vertical) <br /> Risk Assessment, <br /> Evaluate risk of harm imposed if any to health, safety, <br /> and public welfare <br /> Characterizes existing and potential exposure pathways <br /> Characterized all potential human and environmental <br /> receptors <br /> Evaluates where contaminants are going; transport <br /> Evaluates fate and deterrnines action if necessary <br /> Results of the assessment give the basis to determine <br /> whether action is necessary <br /> Phase IR Identifies potential remediation alternatives <br /> Evaluates and chooses one <br /> Class C Response Action Outcome: <br /> .� <br /> No substantial hazard remains on site <br /> Periodic evaluation of the solution <br /> Requires copy of a plan to achieve a pennanent solution <br /> Requires description of any operation and maintenance <br /> Requires monitoring <br /> At the end of the review of Augat's proposal, DEP will review the <br /> appropriateness of the Risk Assessment, and determine if additional <br /> work is needed or if a temporary solution has been reached indicated <br /> Mr. wood. <br /> Ms.Papadopoulos indicated that the Southeastern Regional DEP Office <br /> will consider public input while they are conducting the research and <br /> review of the Risk Assessment. It was noted that the process <br /> will take approximately one month to complete. <br /> Jeff Davis,counsel for the Augt facility indicated that his client is proud <br /> of what has been accomplished to date. Mr. wood agreed,and stated that <br /> Augat has responded and complied with all of the requirements in a <br /> timely fashion. <br />