Laserfiche WebLink
t <br /> dinghy and kayak on the salt marsh that need to be removed. The Agent also reminded <br /> the owner that the DEP # needs to be displayed on the float and one of the seaward <br /> piles. <br /> No comment from the public <br /> Motion. Mr. McKay moved to close and Issue, seconded by Mr. Smith. Vote <br /> unanimous 4-0 <br /> 6:12 Richard T. and Shirley K. Henshall, 24 captains Row. Proposed removal and <br /> replacement of two trees, invasive plant management,.and creation of vista <br /> pruning corridors with maintenance in perpetuity. <br /> Resource Area: Buffer Zone to coastal Bank and BVW, shoestring Bay <br /> Michael Talbot, Environmental Landscape Consultants, represented the applicants. He <br /> stated the applicants have contracted with ELC to represent them to obtain a Vista <br /> pruning permit in perpetuity to maintain their existing views of Shoestring Bay along with <br /> the management of invasive species, removal of two hazardous trees and replacement <br /> tree plantings. He noted the property is separated from the hay by Mashpee Neck <br /> Road. They will do the same enact pruning plan that was created in 2003 and do it in <br /> perpetuity. He noted the two trees which are over the deck need to be removed and <br /> they will be replaced. Mr. Talbot said they will install permanent stakes so.the corridors <br /> will be marked. <br /> The Agent noted the property on photos. He showed a close up image of the two trees <br /> to be removed. <br /> No comments from the public <br /> Motion: Mr. smith roved to close and Issue, seconded by Mr. McKay.ay. Vote <br /> unanimous 4-0 <br /> 6:16 Gooseberry Island Trust, 0 Gooseberry Island. Reque,st confirmation of <br /> existing resource area delineation <br /> Motion: Mr. McKay moved to continue the hearing at the request of the applicant <br /> to January 26 at 6:03 p.m., seconded by Mr. smith. Mote unanimous 4-0 <br /> 0:18 New Seabury Golf club, LLC/Neter seabury Beach club, LLC, 236 shore <br /> Drive. Proposed construction of second story to existing structure and access <br /> stairs to coastal bank. of <br /> Resource Area: LSCSF, coastal Bank, coastal Dune, buffer zone.to coastal <br /> Beach-and Land Under ocean. <br /> lerian Kealey, BSC Group, represented the applicant. He stated that the project was <br /> the construction of an addition and remodeling to an existing structure. The project <br /> involves the construction of ars addition over the existing footprint with a second story <br /> deck. Also there will be construction of access stairs from the top of the coastal bank to <br />