My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/13/2017 CONSERVATION COMMISSION Minutes
>
7/13/2017 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 5:18:39 PM
Creation date
1/30/2019 2:39:32 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> HEARINGS: <br /> 6:00 Air Force civil Engineer center (Applicant), 300 Nathan Ellis Highway, <br /> Proposed water main installation and connection to Town water. Owner of <br /> record MEZ fealty. continued from 18/2017 to allow applicant time to submit <br /> plans. ICDA <br /> Resource Area: Buffer Zones.to Banks Associated with Land Under Waterbodies, <br /> Waterways. <br /> Joe DeNuuio, A Plus construction, represented the applicant. He explained the <br /> proposed project is to allow for a water main installation and connection to Town water <br /> on property located at Soo Nathan Ellis Highway. He illustrated the water mains to be <br /> installed on the street. He stated a pre-construction meeting with Mashpee conservation <br /> Agent prior to construction will be held. They will also place erosion controls in aeeas of <br /> disturbance that will result in sediment deposits in wetlands during construction and <br /> erosion controls will not be removed until area of disturbance is stabilized. <br /> No comments from the Public <br /> Motion: Mr.. Smith moved a Negative Determination, seconded by Mr. Shaw. Vote <br /> unanimous 6-0. <br /> 6:03 ,Air Force civil Engineer center(Applicant), 476 Nathan Ellis Highway. <br /> Proposed Water rain installation and connection to Town water. Owner of <br /> record: Michael & Susan Musto. continue from 6181 o17 to allow applicant time to <br /> submit plans. RDA <br /> Resource Area: Buffer Zones to Banks Associated with Land Under Waterbodies, <br /> Waterways. <br /> Joe DeNuvio, A Flus construction, represented the applicant. He explained the ' <br /> proposed project is to allover for a water main installation and connection to Town water <br /> on property located at 475 Nathan Ellis Highway. He noted the mater mains to be <br /> installed on the street. He stated a pre-construction meeting with Mashpee <br /> Conservation Agent prior to construction will be held. They will also place erosion <br /> controls in areas of disturbance that will result in sediment deposits in wetlands during <br /> construction and erosion controls will not be removed until area of disturbance is <br /> stabilized. <br /> No comments from the Public <br /> Motion: Mr. Smith moved a Negative Determination, seconded by Mr. shave. Vote <br /> unanimous 6-0. <br /> 6:06 Air Force Civil Engineer center(Applicant), 62 Quail Hollow load. Proposed <br /> Water main installation,and connection to Town water. owner of record. Donald <br /> M Donway. continued from 61812017 to allow applicant time to submit plans. RDA <br /> Resource Area: Buffer Zones to Banks Associated with Land Under waterbbd ies, <br /> Waterways. <br />
The URL can be used to link to this page
Your browser does not support the video tag.