My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/12/1997 BOARD OF SELECTMEN Minutes
>
4/12/1997 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 3:09:55 PM
Creation date
1/30/2019 2:43:39 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
04/12/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> N <br /> ange Order <br /> OWNER [x] <br /> - iIA Document G701 Electronic Format ARCHITECT Lxj <br /> a Y CONTRACTORx <br /> C� <br /> FIELD LxJ <br /> OTHERC o4 <br /> C <br /> A ROJECT: CHANGE ORDERNUMBER.• <br /> 036 <br /> 5';name, address) <br /> ll�ashpee <br /> High School DATE: March 19 1997 <br /> VashRee,.MA <br /> ARCHITECT'S PROJECT NO. 94023 <br /> fO CONTRACTOR: CONTRACT DATE: <br /> Ma_y $ 1995 <br /> .name, address) <br /> .The Stone,Buildi,n�CompanY CONTRACT FOR: General Construction <br /> 780 Allens Avenue <br /> Providence,_R1 02905 <br /> The Contract is changed as follows: <br /> I_.Add steel beam supports in Sector C for mechanical piping, per Change Estimate 51 dated 3117197. <br /> 2. Add additional layer of dlywall on south wail of Stair No. 2 er Change Estimate 107 dated 315197. <br /> 3.. Add-scupper drain in cooling tower room per Change Estimate 121 dated 10128197. <br /> 4. Modify handsink in Room 120AI, per Change Estimate 159 dated 315197. <br /> . .5.Add cold water supply check valves er Change Estimate 161 dated 315197. <br /> 6. Add piping to Gym radiation panels, exhaust registers and dampers to AHU--8 and wire ATC controls per <br /> Chan e Estimate 173 dated 3/3197. <br /> Not valid until signed by the Owner, Architect and Contractor. <br /> -5- <br /> he original (Contract Sum) • was $18,1090,5000.00 <br /> ,Net change by previously authorized Change Orders $15179.727.00 <br /> �U <br /> ,,ihe (Contract Sum��� sunrandt-�e -a��um Primo} <br /> #ior to this Change Order was $197269,727 X00 <br /> .THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS <br /> _ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS <br /> ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br /> AIA DOCUMENT G701 -CHANGE ORDER- 1987 EDITION-AIA-COPYRIGHT 1987-THE AMERICAN INSTITUTE OF ARCHITECTS, I735 NEW YORK AVENUE,N.W., <br /> .WASHINGTON,D.C.,20006-5292.WARMING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.This document was electronically produced under <br /> iiaense number 797001239 and can be reproduced without violation until 7/31197. <br /> Electronic Document Service G701-1987 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.