My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/20/1997 BOARD OF SELECTMEN Minutes
>
10/20/1997 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 4:01:37 PM
Creation date
1/30/2019 4:00:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
10/20/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board of Selectmen <br /> Minutes 3 <br /> October 20, 1997 <br /> STD BUSUESS1 <br /> Higodc • (continued) <br /> Requirements to establish a Historic District,and create a Study Committee <br /> under MGL, Chapter 40C state that(3)members from the following <br /> organizations shall sit on this committee; <br /> Mashpee Historical Commission <br /> American Institute of Architects <br /> Board of Realtors <br /> In addition,membership should be sought from the Wampanoag Indian <br /> Tribal Council, a representative from property owners within the area, <br /> and the Planning Board. The seventh member at large could be a landscape <br /> architect, a long-tim.e resident of the area,an attorney or professional. <br /> historian. <br /> It is the consensus of the Board to initiate the process to begin a <br /> Historic District Study Committee. Mr. Whritenour was directed to <br /> begin the advertisement process. <br /> ELBIK. Q <br /> t <br /> None at this time. <br /> k <br /> APPODMAENISAND.HEARZK& <br /> DEW 121, rv: EW=Rod W.Q <br /> a <br /> Greg Taylor,Director of Public Works presented preliminary estimates <br /> to the Board of future DPW road work projects. It was noted that the <br /> Route 151 project,' Great Neck Road South and Old Barnstable Road <br /> Quinaquisset traffic signal, and the Bridge projects are 100%funded, <br /> Sidewalks and revised road intersections are not included in Mr. Taylor's <br /> •na estimates for future road work projects. Selectman Caffyn <br /> preliminary . <br /> suggested that an extension program be developed and dedicated to <br /> aths each year. Selectman D'nizio recommended that Mr. Taylor <br /> bikep y <br /> prioritize Old Barnstable Road for FY9S. <br />
The URL can be used to link to this page
Your browser does not support the video tag.