My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/12/1996 BOARD OF SELECTMEN Minutes
>
02/12/1996 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:03:18 PM
Creation date
1/31/2019 12:24:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
02/12/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Derrick 1 coordination drawings. <br /> 13. 11/17/95-Stone submits first floor of Derrick <br /> 3,4&5 coordination drawings. <br /> 14. 11/7/95-SMMA returns first floor of Derrick <br /> 3,4&5 coordination drawings requiring <br /> compliance with submission requirements. <br /> '515. 11/13/95 Stone submits second floor of <br /> Derrick 3,4&5 coordination drawings <br /> 16. 11/13/95-SMMA returns second floor of <br /> :a <br /> Derrick 3,4&5 coordination drawings <br /> sy# F requiring compliance with submission <br /> t requirements. <br /> 17. 11/21/95-SMMA field observes Fire Sprinkler <br /> work installedwithut_approved 5hQp <br /> drawings,returned revise and resubmit,dated <br /> 9/19/95. <br /> 18. 11/21/95-SMMA field observes mechanical <br /> ductwork and piping installed without <br /> approved shop drawings. <br /> a <br /> 19. 11/30/95-Stone submits Derrick 4 <br /> rj coordination drawings without conflict. <br /> 20. s 12/01/95-Stone submits revised Derrick 1, <br /> partial Derrick 2,3 and 5 coordination drawings <br /> with conflict. <br /> h; <br /> 21. 12/5/95-Const Meeting 14-Stone notified <br /> that installation of materials has commence <br /> without approved shop drawings,a non- <br /> compliance issue and that payment requests <br /> for such work would not be certitified. <br /> 22. 12/7/95--SMMA acknowledges receipt of <br /> Derrick 4 coordination drawings <br /> 23. 12/12/95-SMMA acknowledges receipt'of <br /> revised Derrick 1,partial Derrick.2,3 and 5 <br /> coordination drawings and provides response <br /> to conflict <br /> 24. 12/22/96-Stone submits revised Derrick 2 and <br /> s with 4 second floor coordination drawings g <br /> << conflict. <br /> 25. 1/4/96-SMMA acknowledges receipt of <br /> revised Derrick 2 and 4 second floor <br /> coordination drawings and provides response <br /> kY.. to conflict <br /> 26. 1/10/95-Special Meeting 6-special meeting <br /> to review corner block shapes to be submitted <br /> as shop drawings <br /> 27. 1/18/96-Corrective Action 7- SMMA notifies <br /> Stone that interior drywall partition instaUd <br /> mdthout aj I shQpra ,returned <br /> revise and resubmit 8/31/95 <br /> 28. 1/24/95-SMMA field observes stairs instailtd <br /> ■ <br /> Symmes Maini&McKee Associates page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.