31. 1/18/96-Corrective Action 6-SMMA notifies <br /> Stone that interior CMU installation and <br /> interior partition drywall is not in compliance <br /> relating to heating in vicinity of space heaters. <br /> 1• r�i�k�-�p <br /> 32. 1/24/96-Special Meeting 7-special meeting <br /> =s' to review interior partition framing non- <br /> compliance issues <br /> C. SHOP DRAWINGS/COORDINATION DRAWINGS <br /> 1. <br /> 6/1/95-Stone submits Shop Drawing Schedule <br /> (SDS) <br /> 2. 6/1/95-SMMA return SDS to be revised,no 7/5/95-Stone resubmits SDS, dated 6/20/95 <br /> dates provided. <br /> 3. 7/5/95-SMMA returns revised SDS,missing <br /> sections and review dates needed. All steel to <br /> be completed by 7/19/95 <br /> 4. 7/13/95-SMMA notifies Stone to follow <br /> correct shop drawing procedure. <br /> 5. 8/2/35-Const Meeting 6-Stone notified that <br /> SDS required to be resubmitted. <br /> 6. 8/31/95-SMMA notifies Stone that Stone has 9/25/95-Stone submits revised SDS, steel <br /> yet to submit revised SDS. shop drawings to be start 6/28/95 and finish <br /> 7/19/95 (Actual start 7/5/95 and finish <br /> 11/30/95) <br /> 7. 9/6/95-Const. Meeting 8-Stone notified of <br /> requirement to submit coordination drawings <br /> in advance of work. coordination drawings <br /> required to be submitted prior to fabrication <br /> and installation) <br /> 8. 9/8/95-SMMA confirms that Stone has <br /> requested processing of steel shop drawings <br /> out of order to expedite. At that time only <br /> Sector A&B column and beam received,no <br /> Sector E. <br /> 9. 3/14/95-SMMA notifies Stone of processed <br /> shop drawings to date;steel columns and <br /> beams for sector 1 and portion of 2,decking <br /> for sectors 1-4 and joists for sectors 1 and 2. <br /> s' SMMA was reviewing columns and beams for <br /> f balance of sector 2 and balance ofjoists. <br /> 10. 9II 20 95-Const.Meeting 9-Stone notified of <br /> requirement to submit coordination drawings <br /> in advance of work. ( coordination drawings <br /> =� <br /> required to be submitted prior to fabrication <br /> and installation) <br /> 11. 11/1/95-Stone submits coordination drawings <br /> for Derrick 1 without any conlficts. <br /> 12. 11/1/95-SMMA acknowledges receipt of <br /> ■ <br /> Symmes Naini&McKee Associates Page 6 <br />