Laserfiche WebLink
barrier not installed in compliance. Protection installation of roofing vapor barrier. <br /> for masonry below 20 OF not in place. 12/13/95-Stone requests opinion as to <br /> protection of masonry below 200F. <br /> 16. 12/05/95-Const, Meeting 14-non-complying <br /> =a Y: work in roofing relating to vapor barrier, <br /> bubbles and cold weather installation,masonry <br /> relating to cold weather protection discussed <br /> as well as the lack of building enclosure and <br /> �•::7;,; 1_£- <br /> heating where interior trades work has <br /> commenced <br /> t;•: 4 17. 12/14/95-SMMA responds to Stone request <br /> for opinion on protection of masonry below <br /> 200F. <br /> 18. 12/22/95-SMMA notifies Stone that overhead <br /> piping commenced in Derrick 6 prior to <br /> submission of coordination drawings. <br /> :i 19. 12/27/95--SMMA field report observed <br /> interior framing not in compliance. <br /> 20. 1/4/96-SMMA requests Stone to submit <br /> manufacturer's data on acoustical deck, re. <br /> acoustical material exposure to water <br /> 21. 1/5/96-SMMA requests roof manufacturer <br /> roofing inspection reports from Stone re,none <br /> provided to date. ' <br /> 22. 1/8/96-SMMA requests Clerk and Stone to 1/17/96-Stone submits test method to <br /> record areas of masonry not protected, 19 determine extent of unprotected masonry. <br /> locations to date. <br /> 23. 1/10/96-Special Meeting 5-special meeting <br /> -compliance issues and <br /> to review roofing non <br /> cold weather roofing procedures: <br /> 24. 1/11/96-SMMA notifies Stone of concern 1/15/96-Stone responds that checking <br /> y due to extent of drywall framing not in procedure is not contractually required but Sub <br /> compliance and defines a checking procedure has been notified. <br /> to be followed to correct the work. <br /> "= 25. 1/15/96-SMMA notifies Stone that sheathing 1/16/96--Stone responds that all brace bays <br /> k,=s_ erection is not acceptable prior to brace frame complete. <br /> completion. <br /> 26. 1/15/96-UTS report indicates numerous <br /> {, Loose and missing bolts in Derricks 8-12. <br /> 27. 1/15/96-Corrective Action 3-SMMA notifies <br /> '? Stone that damaged exterior sheathing is to be <br /> replaced. <br /> F . 28. 1/17/96-UTS report indicates several joists <br /> i3 <br /> not welded to beam in Derrick 8, <br /> ^sn= 29. 1/18/96--Corrective Action 4-SMMA notifies <br /> ? .Y <br /> Stone that damaged exterior sheathing is to be <br /> replaced <br /> 30. 1/18/96-Corrective Action 5-SMMA notifies <br /> Stone that exterior sheathing installation and <br /> interior partition framing is not in compliance <br /> ■ <br /> 5ymmes Maini&McKee Associates Rage 5 ` <br />